Dubai Hills · Emaar

Can I Add a Ground-Floor Bedroom for My Parents in Dubai Hills?

It may be possible by rearranging the ground floor or as an extension. It depends on your villa and Emaar’s review, so ask us.

A ground-floor bedroom for your parents may be possible in a few ways. Moving non-structural walls can turn a study or guest room into a bedroom, without adding GFA. Enclosing a patio is possible if the elevation does not change. A new room as an extension is reviewed case by case. Send us your villa type and idea, and we will advise on your case. A garage cannot be used, as it stays parking.

SimplestRearrange the layout
ExtensionCase by case
GarageNot allowed

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Bathroom: An accessible bathroom may need new drainage.
  • Doors: Wider doors help with mobility.
  • Patio: Must keep the elevation.
  • Lift: Another option if upstairs must stay in use.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Can I use the garage?

No, it stays parking.

Can I extend for a bedroom?

It depends on your villa. Ask us.

Do I need approval to move walls?

Not for non-structural walls, but we check them first.

Can you design for mobility needs?

Yes, tell us what is needed.

Related guides

Keep reading