Arabian Ranches · Emaar

Can I Close My Balcony in Arabian Ranches?

Yes, you can close a rear balcony in Arabian Ranches, and it adds GFA. Front balcony closures are strictly not allowed.

You can close a rear balcony, not a front one. Emaar’s guide allows a roofed rear balcony to be closed with non-reflective glass, clear glass or block wall, as long as the overall design and structure are kept. A balcony without a roof needs a concrete roof and a parapet level with the existing one, subject to approval. Emaar charges on the added GFA. You need the Emaar NOC, then the DDA permit.

RearAllowed
FrontNot allowed
LimitReviewed as added GFA

Emaar’s guide

Enclosure rules: patio, balcony, terrace and voids

Emaar reviews these as added area. From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
PatioAllowed if the external elevation does not change. On the front, keep the arch: windows and doors sit flush with its inner edge.
CourtyardOnly an open courtyard at G+1 level, within the building line, with a matching parapet.
Rear balcony with a roofCan be closed with non-reflective glass, clear glass or block wall.
Rear balcony without a roofCan be closed with a new concrete roof and a parapet level with the existing one, subject to approval.
Front balconyStrictly not allowed.
Inaccessible terraceOn the rear or side, it can become living space, matching the villa.
Main doorCan move only onto an existing slab, and must not block a window or vent.
Void or double-height spaceAllowed with structural approval before works: independent columns, or bolted steel beams subject to Emaar and authority approval.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Colour: The same colour as the villa.
  • Parapet: Matches the roof parapet design.
  • Townhouses: Keep the railings and do not overlook neighbours.
  • Structure: We check the slab.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Can I close my front balcony?

No, front balcony closures are strictly not allowed.

Can I use glass on a rear balcony?

Yes on a roofed balcony: non-reflective or clear glass, or block wall.

Does it add GFA?

Yes.

Do I pay Emaar for it?

Yes, on the added GFA.

Related guides

Keep reading