Unapproved Exterior Colour on a Nakheel VSR
An exterior colour that Nakheel did not approve can show up in the Villa Status Report (VSR). It needs to be fixed before a sale, usually by repainting in the approved colour with a Nakheel NOC.
Exterior painting in Nakheel communities needs a Nakheel NOC and a Trakhees permit. Nakheel usually asks owners to match the existing colour and provides the colour code. A colour that was not approved can show up in the VSR and needs to be fixed before a sale, usually by repainting in the approved colour.
What you need to know
- Colour code: Nakheel provides the colour code for the villa.
- Scaffolding: Approved by Trakhees, and by the RTA as well if it stands on the road.
- Interior: Interior painting needs no NOC.
- Before a sale: Unapproved works on the VSR need fixing before a sale.
Documents you will need
- Title deed and owner Emirates ID or passport
- Villa plans from Nakheel, or as-built drawings
- Proposed drawings
- Stamped structural calculations for structural works
- Photos of the area
At a glance
Unapproved Exterior Colour on a Nakheel VSR at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Owner and us Step 1 | Get the VSR and the colour code from Nakheel. | — |
| Nakheel Step 2 | Reviews the drawings and issues the NOC. | — |
| Trakhees Step 3 | Permit, including scaffolding, plus RTA approval if it stands on the road. | — |
| Nakheel and Trakhees Step 4 | Inspection and completion. | — |
How it works
How it works
Get the VSR and colour code
Apply for the Nakheel NOC
Trakhees permit and scaffolding approval
Repaint in the approved colour
Re-inspection
Who does what
Three parties, one route
Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →Exterior works that need a NOC
- Repainting the façade
- Boundary walls and gates
- Window frames and doors
Why applications come back
- Drawings that do not match the villa as it stands
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Can an unapproved colour stop my villa sale?
Unapproved works on the VSR need to be fixed before a sale, and that includes an unapproved exterior colour.
Do I need a NOC to repaint in the approved colour?
Exterior painting needs a Nakheel NOC and a Trakhees permit, even when repainting.
Where do I get the approved colour?
Nakheel provides the colour code.
Does interior painting need approval?
No. Interior painting needs no NOC.
Related guides
Keep reading
Related
