Trakhees · CED

Trakhees Painting Approval

Trakhees issues the permit for external repainting in Trakhees areas such as Palm Jumeirah, JVC, Al Furjan and Jumeirah Golf Estates. In communities the developer NOC comes first; for buildings, the owners association or building management NOC.

When Trakhees Is Involved

External repainting of villas and buildings in Trakhees areas, and approval of scaffolding, gondolas and rope access for facade works.

Building NOCOwners association
Authority PermitDM, DDA or Trakhees
Access ApprovalScaffolding & gondola

What you need to know

  • Access Equipment: Scaffolding, gondolas and rope access need Trakhees approval, plus RTA when the equipment is on the road.
  • Developer NOC first: Nakheel communities need the Nakheel NOC, JGE the JGE NOC from wasl, and JAFZA the JAFZA NOC.
  • Trakhees CED: The Civil Engineering Department issues the building permit and inspects at completion.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.

Documents you will need

  • Title deed or lease, and owner ID
  • Developer NOC (Nakheel, wasl or JAFZA)
  • Existing or as-built drawings
  • Proposed drawings and stamped structural calculations
  • Photos of the area

At a glance

Trakhees Painting Approval at a glance

Who does what, step by step.

WhoApproval routeGuides
Owners association or building management
Step 1
NOC for the facade works and the colour.—
Authority — Trakhees
Step 2
Permit for the repainting works.—
Authority — Trakhees (and RTA when on the road)
Step 3
Approval for scaffolding, gondola or rope access.—
Contractor and authority
Step 4
Works, then inspection.—

How it works

How the Painting Approval Works

Facade Survey & Access Plan

Owners Association / Management NOC

Authority Permit (DM, DDA or Trakhees)

Scaffolding / Gondola Approval

Painting Works

Inspection & Sign-Off

Who does what

Who does what

🏘️

Master developer

Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.

Trakhees communities →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Buildings We Help With

  • Villa Exterior
  • Residential Tower
  • Commercial Building
  • Warehouse
  • Scaffolding
  • Gondola
  • Why Owners Use Structural Solutions

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Developer NOC missing
  • Unapproved works already on site
  • Missing owner documents

Questions

Questions owners ask

Does Trakhees issue painting permits?

Yes — for external painting in its areas, after the developer or building NOC.

Do I need a NOC to paint the outside of my villa?

Yes in master-developer communities — the developer NOC, then the permit from DM, DDA or Trakhees.

Do I have to keep the same colour?

Developers usually ask you to match the existing colour and provide the colour code.

Do I need approval to paint inside my villa?

No — interior painting of a villa does not need a NOC (Wasl properties have their own painting NOC).

Do scaffolding or gondolas need approval?

Yes — from DM, DDA or Trakhees, plus RTA when they are on the road.