We design the paving build-up, levels and edge details to tie into the existing kerb and footpath, shown on DLTM drawings from a site survey.
RTA External Paving & Interlock Permit Dubai
External paving and interlock laid outside your plot limit — driveway aprons, verges and footpaths — is in the RTA road reserve and needs RTA approval, and where applicable the developer’s NOC.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Inside or Outside the Plot
Paving inside the plot limit is private. Outside it, the paving belongs to the road reserve and is approved through the access design, construction NOC and sidewalk modification permit.
How We Get Your Plot Access Approved
01
Site Survey & Plot Limits (DLTM)
02
RTA Access Design Study
03
Developer Plot Access NOC
04
RTA Construction NOC
05
RTA Sidewalk Modification Permit
06
Works, Handover & Deposit Refund
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Design and Reinstatement
Projects We Handle
Driveway Apron
Verge Paving
Footpath Interlock
Gate Area Paving
Compound Access Paving
Paving Replacement
RTA External Paving & Interlock Permit Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the plot and prepares access, kerb and interlock drawings in PDF and AutoCAD DLTM. |
| 2 | RTA | Access design study (concept approval). |
| 3 | Master developer | Plot access, curb cut and interlock NOC where the community has one. |
| 4 | RTA | Construction NOC, then the sidewalk modification permit. |
| 5 | RTA and developer | Inspection after works and security deposit refund. |
Documents Required
- Title deed and affection plan
- Owner passport and Emirates ID copy
- Survey-based drawings in PDF and AutoCAD DLTM
- RTA-approved access design (for the developer NOC)
Key Technical Rules
- Order of approvals: RTA access design study → developer plot access NOC → RTA construction NOC → sidewalk modification permit.
- DLTM drawings: developers such as Nakheel return drawings that are not PDF plus AutoCAD DLTM.
- Outside the plot limit: kerb, verge and interlock works are in the road reserve.
- No early works: concept approval alone does not allow works on site.
- Deposit refund: after the works are inspected and accepted.
RTA Design Study
First step
DLTM Drawings
PDF + AutoCAD
Sidewalk Permit
Before works
Why Owners Choose Structural Solutions
Full Access Approval Chain
RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.
DLTM Drawings From Site Survey
We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.
Fewer Returned Submissions
Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.
Get Your Plot Access Approved
Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.
RTA External Paving & Interlock Permit Dubai — FAQs
Do I need RTA approval for interlock outside my plot?
Yes — it is in the road reserve and needs RTA approval and a sidewalk modification permit.
Do you design the paving?
Yes — build-up, levels and tie-in details on survey-based DLTM drawings.
Do you prepare the access drawings?
Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.
Can works start before all approvals?
No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.
Who handles the submissions?
We prepare the drawings and handle the RTA and developer submissions as your consultant.