Do Signs Need Arabic Text in Dubai?

Many business signs in Dubai are required to show the name in Arabic as well as English. The exact rule depends on the authority and the type of sign, so we confirm it for your location before the design is finalised.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

The Short Version

Landlord, mall or developer approval first; then the signage authority for your location; plus engineer-stamped structural calculations for larger, rooftop, freestanding or projecting signs.

How We Get Your Signage Approved

01

Sign Design, Size & Location Reviewed

02

Landlord, Mall or Developer NOC

03

Structural Check Where Needed

04

Engineer-Stamped Drawings & Calculations

05

Authority Signage Permit

06

Installation & Inspection

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

How We Help

We confirm which approvals apply, prepare the drawings and calculations, and handle the submissions.

Projects We Handle

Shop Sign

Mall Unit Sign

Office Sign

Rooftop Sign

LED Screen

Rebranding

Do Signs Need Arabic Text in Dubai? at a Glance

StepWhoWhat happens
1Structural engineerPrepares the drawings and calculations to the authority's format and handles the submissions.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — Dubai Municipality, DDA or Trakhees — depending on the communityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing approved drawings — or an as-built survey if you have none
  • Proposed drawings and stamped structural calculations — prepared by us

Key Technical Rules

  • One authority per area: each community has one building authority — DM, DDA or Trakhees.
  • NOC before permit: in master-developer communities the developer NOC comes first.
  • Authority format: drawings must follow that authority's submission format.
  • Registered consultant: submissions are made by an authority-registered consultant.
  • Completion certificate: issued after the final inspection.
Fit-Out Submission Packages Done Right DM Permits

Right Authority

DM, DDA, Trakhees

Developer NOC

Where required

Registered Consultant

Handles submission

Why Businesses and Sign Companies Choose Structural Solutions

Structural Engineering In-House

Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.

Engineer-Stamped Drawings

Drawings and calculations stamped for landlords, malls, developers and authorities.

Full Approval Route

From the landlord, mall or developer NOC through to the authority signage permit.

Get Your Signage Approved

Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.

Do Signs Need Arabic Text in Dubai? — FAQs

Do Signs Need Arabic Text in Dubai?

Many business signs in Dubai are required to show the name in Arabic as well as English. The exact rule depends on the authority and the type of sign, so we confirm it for your location before the design is finalised.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.

Why choose an engineering consultancy for signage?

Because larger signs need structural engineering — we provide calculations, stamped drawings and the approvals in one place.