We confirm which approvals apply, prepare the drawings and calculations, and handle the submissions.
Who Approves Signage in Dubai?
Signage is approved in two layers: first the landlord, mall or master developer, then the signage authority for the location — the mainland authority or a free zone such as DDA, Trakhees (JAFZA), DMCC, DIFC, Dubai South or Dubai Silicon Oasis. RTA can also be involved for signs facing or affecting roads.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
The Short Version
Landlord, mall or developer approval first; then the signage authority for your location; plus engineer-stamped structural calculations for larger, rooftop, freestanding or projecting signs.
How We Get Your Signage Approved
01
Sign Design, Size & Location Reviewed
02
Landlord, Mall or Developer NOC
03
Structural Check Where Needed
04
Engineer-Stamped Drawings & Calculations
05
Authority Signage Permit
06
Installation & Inspection
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
How We Help
Projects We Handle
Shop Sign
Mall Unit Sign
Office Sign
Rooftop Sign
LED Screen
Rebranding
Who Approves Signage in Dubai? at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Prepares the sign drawings and, for larger signs, the stamped structural calculations. |
| 2 | Landlord, mall or master developer | Issues the NOC for the works. |
| 3 | Authority — Dubai Municipality, DDA or Trakhees — depending on the community | Reviews the drawings and issues the permit. |
| 4 | Landlord and authority | Completion inspection. |
Documents Required
- Trade licence
- Tenancy contract or Ejari
- Landlord, mall or developer NOC
- Sign design with size, materials and position
- Photos of the facade or location
Key Technical Rules
- NOC first: the landlord, mall or developer approves the sign before the authority permit.
- Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
- Size and position rules: set by the building and the authority for the area.
- Electrical safety: illuminated signs need safe electrical details.
- Permit before installation: signs go up only after approval.
Landlord NOC
First approval
Wind & Fixings
Stamped calculations
Signage Permit
Before installation
Why Businesses and Sign Companies Choose Structural Solutions
Structural Engineering In-House
Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.
Engineer-Stamped Drawings
Drawings and calculations stamped for landlords, malls, developers and authorities.
Full Approval Route
From the landlord, mall or developer NOC through to the authority signage permit.
Get Your Signage Approved
Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.
Who Approves Signage in Dubai? — FAQs
Who Approves Signage in Dubai?
Signage is approved in two layers: first the landlord, mall or master developer, then the signage authority for the location — the mainland authority or a free zone such as DDA, Trakhees (JAFZA), DMCC, DIFC, Dubai South or Dubai Silicon Oasis. RTA can also be involved for signs facing or affecting roads.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Can you work with my sign company?
Yes — we provide structural calculations, stamped drawings and approval support for sign makers.
Why choose an engineering consultancy for signage?
Because larger signs need structural engineering — we provide calculations, stamped drawings and the approvals in one place.