Signage NOC Dubai

A signage NOC is the landlord’s, mall’s or master developer’s written approval for your sign — its design, size, position and fixing — before the authority signage permit. Most shop, office and building signs in Dubai need one.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Who Issues a Signage NOC

The building owner or landlord for standalone and street-front units, mall management for mall units, and the master developer in communities they manage. Each checks the sign against its own design rules.

How We Get Your Signage Approved

01

Sign Design, Size & Location Reviewed

02

Landlord, Mall or Developer NOC

03

Structural Check Where Needed

04

Engineer-Stamped Drawings & Calculations

05

Authority Signage Permit

06

Installation & Inspection

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

NOC First, Permit Second

The NOC is usually required before the authority will issue the signage permit. Larger or heavier signs also need engineer-stamped structural calculations as part of the submission.

Projects We Handle

Shopfront Sign

Office Sign

Mall Unit Sign

Building Facade Sign

Rebranding

New Tenant

Signage NOC Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the sign drawings and, for larger signs, the stamped structural calculations.
2Landlord, mall or master developerIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, mall or developer NOC
  • Sign design with size, materials and position
  • Photos of the facade or location

Key Technical Rules

  • NOC first: the landlord, mall or developer approves the sign before the authority permit.
  • Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
  • Size and position rules: set by the building and the authority for the area.
  • Electrical safety: illuminated signs need safe electrical details.
  • Permit before installation: signs go up only after approval.
Office and retail fit-out approvals in Dubai — Structural Solutions

Landlord NOC

First approval

Wind & Fixings

Stamped calculations

Signage Permit

Before installation

Why Businesses and Sign Companies Choose Structural Solutions

Structural Engineering In-House

Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.

Engineer-Stamped Drawings

Drawings and calculations stamped for landlords, malls, developers and authorities.

Full Approval Route

From the landlord, mall or developer NOC through to the authority signage permit.

Get Your Signage Approved

Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.

Signage NOC Dubai — FAQs

What is a signage NOC in Dubai?

The landlord’s, mall’s or developer’s written approval for your sign before the authority permit.

Who issues it?

The landlord, mall management or master developer, depending on the location.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.