We survey the villa on site and prepare AutoCAD drawings in DDA format, ready to use as the base for the next developer NOC or DDA application. Motor City villas follow the community’s design guidelines on setbacks, height and external appearance.
Motor City Villa As-Built Drawings
As-built drawings show the villa exactly as it stands today — needed when original drawings are missing, after past changes, before new applications and before selling. We handle this for homes in Motor City, working with Union Properties and DDA.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Why It Matters in Motor City
As-built drawings show the villa exactly as it stands today — needed when original drawings are missing, after past changes, before new applications and before selling.
How We Handle It
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Drawings Issued
06
Ready for Next Application
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
What We Prepare
Common Villa As-Built Drawings Projects in Motor City
Original Drawings Missing
Before a New Extension
After Unapproved Works
Before Selling
For Regularisation
For Completion Certificate
Motor City Villa As-Built Drawings at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — DDA | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Motor City Owners Choose Structural Solutions
DDA Submissions
We prepare drawings and calculations in DDA format and manage the permit through to completion.
Union Properties NOC Coordination
We prepare the community NOC submission to the guidelines for Motor City.
Engineering In-House
Structural design, calculations and drawings by our own engineers.
Start Your Motor City Project
Tell us about your home in Motor City and what you plan to change — we will confirm the approvals, prepare the drawings and handle the submissions.
Motor City Villa As-Built Drawings — FAQs
When do I need as-built drawings in Motor City?
When original drawings are missing, after past changes, before new applications and before selling.
Who issues building permits in Motor City?
DDA (Dubai Development Authority), after the Union Properties NOC.
Is the Union Properties NOC separate from the DDA permit?
Yes. The developer NOC covers community rules; the DDA permit covers the structural and building approval. Both are needed.
Do you prepare DDA-format drawings?
Yes — architectural and structural drawings and calculations in DDA format.
Can you handle the whole process?
Yes, from the first drawings to the completion certificate.
