Nakheel · Al Furjan

Al Furjan Villa Extension Rules: Footprint and Setbacks

How big an Al Furjan extension can be is set by the existing villa footprint: extensions stay within it or go upwards, and setbacks from the boundaries must be at least 1.2 m. We check both for your plot before any design work.

What the Footprint Rule Means

The footprint is the area of the plot your villa already covers. Extensions stay inside it, by converting space or building over a single-storey part, rather than out into the garden.

Counts as GFAAdded floor area
Setbacks CheckedPlot rules first
NOC + PermitTwo approvals

What you need to know

  • Why Check Before Design: Designing first and checking later often ends in a rejected NOC. A footprint and setback check at the start means the extension you design is one Nakheel and Trakhees can approve.
  • Footprint and setbacks: extensions stay within the existing villa footprint, with setbacks of at least 1.2 m.
  • Counts as GFA: added floor area is reviewed as additional GFA by the developer and the authority.
  • Existing structure checked: foundations, columns and slabs are checked for the new loads.
  • Matching design: external finishes and rooflines must match the original villa.
  • Completion inspection: required before the extension is used, sold or handed over.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing approved drawings — or an as-built survey if you have none
  • Proposed drawings and stamped structural calculations

At a glance

Al Furjan Villa Extension Rules: Footprint and Setbacks at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Checks the villa footprint and setbacks, designs the extension and prepares stamped drawings and calculations.—
Master developer (where the community has one)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

How We Get Your Extension Approved

Footprint & Setback Check

Villa Type Guidelines Confirmed

Trakhees-Format Drawings

Nakheel Home Modification NOC

Trakhees CED Building Permit

Construction & Sign-Off

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Common Projects in Al Furjan

  • Ground-Floor Extension
  • Maid’s Room
  • Covered Terrace
  • Garage Conversion
  • Pergola
  • Swimming Pool

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

What does within the villa footprint mean?

The extension stays inside the area your villa already covers, or goes upwards. It does not go out into the garden.

Can I extend into the garden?

No. Extensions stay within the existing villa footprint or go upwards, with setbacks of at least 1.2 m.

Do pergolas and terraces count?

Open pergolas and shades are not extensions, but they need a Nakheel NOC. A car parking shade must not exceed 35 m².

Who checks the footprint and setbacks?

Nakheel reviews it in the NOC; we check it before design.

Can you check my plot?

Yes.

Related guides

Keep reading