New rooms usually need openings in existing external walls. We design the new foundations and the openings so the extension and the existing villa work together structurally.
Al Furjan Ground-Floor Extension
A ground-floor extension is the most common way to add space to an Al Furjan villa — a new bedroom, living area or family room. It needs a Nakheel Home Modification NOC followed by a Trakhees CED building permit, and the size depends on your remaining plot coverage and setbacks.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Adding Living Space on the Ground Floor
Ground-floor extensions add built-up area, so Nakheel reviews them against the villa type guidelines and charges AGFA fees on the added area. Trakhees then reviews the structural and architectural drawings.
How We Get Your Extension Approved
01
Plot Coverage & Setback Check
02
Villa Type Guidelines Confirmed
03
Trakhees-Format Drawings
04
Nakheel Home Modification NOC
05
Trakhees CED Building Permit
06
Construction & Sign-Off
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Connecting to the Existing Villa
Common Projects in Al Furjan
New Bedroom
Family Room
Living Room Extension
Home Office
Guest Suite
Covered Terrace Enclosure
Simple Approval Process
How Our Approval Process Works
We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.
Quick Review
We review drawings and project requirements fast.
Plan Design
Our team prepares compliant
drawings and files.
Easy Submit
We submit documents to
Dubai authorities safely.
Final Permit
Receive approvals and
permits without delays.
Proven track record
Across Dubai
Established firm
Years of experience
Highly rated
By our clients
Why Al Furjan Owners Choose Structural Solutions
Plot Checked Before Design
We confirm plot coverage, setbacks and villa type guidelines first, so the design is approvable.
Trakhees CED Format Drawings
Al Furjan is under Trakhees — we prepare architectural and structural drawings in Trakhees format.
Nakheel NOC + Trakhees Permit
One consultant for the Nakheel NOC, AGFA assessment, Trakhees permit and final sign-off.
Start Your Al Furjan Extension
Send us your villa type, plot details and what you want to add — we will check what is possible and manage the Nakheel NOC and Trakhees permit.
Al Furjan Ground-Floor Extension — FAQs
Do I need approval for a ground-floor extension in Al Furjan?
Yes — a Nakheel Home Modification NOC followed by a Trakhees CED building permit.
Who approves extensions in Al Furjan?
Nakheel through its Home Modification NOC, then Trakhees CED through the building permit.
Are AGFA fees charged?
Yes, Nakheel charges AGFA fees on added built-up area.
Does Dubai Municipality issue the permit?
No — Al Furjan is under Trakhees, not DM.
Can you manage the whole extension approval?
Yes, from the plot check to final sign-off.