How Are As-Built Drawings Prepared?

As-built drawings are prepared by surveying the property on site, recording every dimension and element, then drafting the results in AutoCAD and having them reviewed by an engineer before they are issued.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Step by Step

We visit the property, measure rooms, walls, openings and levels, note structural elements and external works, then draft floor plans, elevations and sections. The set is checked against the site and reviewed before issue.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What You Receive

AutoCAD and PDF drawings showing the property as built, ready to use as the base for applications, sales or design work.

Situations We Help With

Villa

Apartment

Warehouse

Office or Shop

Extension Area Only

Full Property

Simple Approval Process

How Our Approval Process Works

We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.

Decorative line divider graphic

Quick Review

We review drawings and project requirements fast.

Plan Design

Our team prepares compliant
drawings and files.

Decorative line divider graphic

Easy Submit

We submit documents to
Dubai authorities safely.

Decorative line divider graphic

Final Permit

Receive approvals and
permits without delays.

Villa Drawings for Dubai Structural Calculations for Villa Modifications in Dubai DDA Steel Works 3rd Party Verification

Proven track record

Across Dubai

Established firm

Years of experience

Highly rated

By our clients

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

How Are As-Built Drawings Prepared? — FAQs

How are as-built drawings prepared?

By an on-site measured survey, AutoCAD drafting and engineer review.

What do they include?

Floor plans, elevations, sections and key details.

What format are they?

AutoCAD and PDF.

Do you visit the property?

Yes.

Can they be stamped?

Yes, for submission.