AutoCAD Drafting Services in Dubai
Drawings that developers, authorities and malls accept, drafted with engineers behind them.
We draft in AutoCAD for villas, apartments, shops, offices and warehouses in Dubai: as-built drawings, existing and proposed layouts, permit drawings, fit-out drawings, DLTM plot drawings and PDF-to-CAD conversions. Because our drafters work with our engineers, the drawings follow the format the developer, authority, mall or building management asks for and can be reviewed and stamped for submission.

Official sources: Dubai Municipality · DDA
What we check
- Plans: Floor plans and layouts
- Elevations: And sections
- Site: Site and DLTM plans
- Structure: Structural drawings
- Format: Developer or authority
- Files: DWG and PDF
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Existing drawings, if available
- Photos and a short description
Route
How we prepare your drawings
The general route. We confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Brief You | What you need and what you have. | — |
| Site visit Our engineers | Where measurements are needed. | As-built survey |
| Drafting Structural Solutions | AutoCAD drawings to the required format. | — |
| Engineer review Our engineers | Checked before issue. | — |
| Revisions Structural Solutions | Until you are happy. | — |
| Issue You | DWG and PDF. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Design
Drawings and calculations by our engineers.
5. Submission
By us.
6. Follow-up
Comments until approval.
What causes problems
- Wrong drawing format
- Drawings not matching site
- No engineer review
Need help with this?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any drawings you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Can you convert PDF drawings to CAD?
Yes.
Do you draft in authority format?
Yes: DM, DDA, Trakhees, developers, malls and building management.
Can the drawings be stamped?
Yes, after engineer review, where the submission needs it.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
