Measured Survey Dubai

A measured survey records the exact dimensions of a villa, apartment or building on site. It is the basis for as-built drawings, renovation designs and authority submissions in Dubai.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What We Measure

Room dimensions, wall positions and thicknesses, openings, levels, structural elements, external works and site boundaries — everything needed to produce accurate AutoCAD drawings.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

From Survey to Drawings

The survey is drafted into AutoCAD and reviewed by our engineers, producing as-built drawings ready for design work or submission.

Common Projects We Handle

Villa Survey

Apartment Survey

Warehouse Survey

Office or Retail Unit

Site & Boundary Survey

Pre-Purchase Survey

Measured Survey Dubai at a Glance

StepWhoWhat happens
1Structural engineerSurveys the site and prepares drawings to the format of the developer and the authority.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — Dubai Municipality, DDA or Trakhees — depending on the communityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

Key Technical Rules

  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.
Villa Drawings for Dubai Emaar Extension Fees

Site Survey

Our own team

Authority Format

DM, DDA, Trakhees

PDF + DWG

Ready to submit

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Measured Survey Dubai — FAQs

What is a measured survey?

An on-site survey recording the exact dimensions of a property.

What is it used for?

As-built drawings, renovation design and authority submissions.

Do you produce CAD drawings?

Yes, in AutoCAD.

Do you survey warehouses?

Yes.

Can you survey before I buy?

Yes.