Apartment As-Built Drawings Dubai

We prepare as-built drawings for apartments in Dubai — for renovation applications, building management submissions, layout changes and sales.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

When Apartments Need As-Built Drawings

Building management and developers often ask for existing-layout drawings before approving renovations. They are also useful when buying or selling a modified apartment.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Existing and Proposed

For renovation applications we prepare the existing as-built layout and the proposed layout side by side, the format most building managements expect.

Common Projects We Handle

Renovation Application

Kitchen Layout Change

Wall Removal

Sale or Purchase

Missing Floor Plans

Tenant Fit-Out

Apartment As-Built Drawings Dubai at a Glance

StepWhoWhat happens
1Structural engineerReviews the unit, prepares the drawings and checks any structural element affected.
2Building management or owners associationIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Landlord and authorityCompletion inspection.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC)
  • Owner passport and Emirates ID copy
  • Building management or owners association NOC form
  • Unit floor plan
  • Contractor documents

Key Technical Rules

  • Building NOC first: the building management or owners association approves the works.
  • Structure untouched without a check: columns, beams and structural walls are never altered without an engineer.
  • Balcony and facade changes: usually need developer approval.
  • Wet areas: waterproofing and drainage are protected during the works.
  • Authority permit: for structural or major works.
Villa Drawings for Dubai Emaar Extension Fees

Building NOC

First approval

Structural Check

Before changes

Authority Permit

Major works

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Apartment As-Built Drawings Dubai — FAQs

Do apartments need as-built drawings?

Often yes, for renovation approvals or when floor plans are missing.

Who asks for them?

Building management, developers and buyers.

Do you show existing and proposed layouts?

Yes.

Do you visit the apartment?

Yes, to measure on site.

Can you help with the renovation NOC?

Yes.