Building permits in Al Barsha are handled by Dubai Municipality. We prepare the as-built drawings in AutoCAD to DM BPS format, so they can be used directly for the next application.
Al Barsha Villa As-Built Drawings
We prepare as-built drawings for Al Barsha villas, showing the villa exactly as it stands today. They are needed when original drawings are missing, after past modifications, before new Dubai Municipality applications, and before selling.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Why Al Barsha Owners Need As-Built Drawings
Many Al Barsha villas have been changed since handover — extensions, enclosed areas, removed walls, pools and pergolas. New applications to Dubai Municipality need drawings that match what is actually on site, so the starting point is an accurate as-built set.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Drawn to Dubai Municipality Requirements
When Al Barsha Owners Call Us
Original Drawings Missing
Before a New Extension
After Unapproved Works
Before Selling the Villa
For Regularisation
For Completion Certificate
Al Barsha Villa As-Built Drawings at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer | Not needed on standalone Dubai Municipality villa plots — required in master-developer communities. |
| 3 | Building authority — Dubai Municipality | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
Al Barsha Villa As-Built Drawings — FAQs
Do I need as-built drawings for my Al Barsha villa?
If the original drawings are missing or the villa has been modified, yes — before new applications or a sale.
Who reviews drawings in Al Barsha?
Dubai Municipality for building permits.
What format are the drawings in?
AutoCAD, prepared to DM BPS format.
Do you visit the villa?
Yes, we carry out a measured survey on site.
Can the drawings be used for a new application?
Yes, they are prepared as the base for your next submission.
