Non-structural works usually need only the MAF NOC. Extensions, wall removal, pools and new structures also need the DDA permit.
Who Approves Modifications in Ghaf Woods?
Modifications in Ghaf Woods are approved first by Majid Al Futtaim (MAF), the master developer, through a community NOC. Where the works are structural, DDA then issues the building permit.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Two Levels of Approval
MAF checks the works against Ghaf Woods’ design guidelines. DDA reviews the structural and building side through its permit.
How We Get It Approved
01
Villa & Scope Reviewed
02
MAF Design Guidelines Checked
03
Drawings & Calculations Prepared
04
MAF NOC Submitted
05
DDA Permit Submitted
06
Inspection & Completion
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Which Works Need Which Approval
Common Projects We Handle
Villa Extension
Swimming Pool
Pergola
Wall Removal
Apartment Renovation
Landscaping
Who Approves Modifications in Ghaf Woods? at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Reviews the villa, prepares the drawings and stamped structural calculations for the change. |
| 2 | Majid Al Futtaim (MAF), master developer | Issues the community NOC against its design guidelines. |
| 3 | Building authority — DDA | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Existing approved drawings — or an as-built survey if you have none
- Proposed drawings and stamped structural calculations — prepared by us
Key Technical Rules
- Structural check first: any change to walls, slabs or openings is checked by an engineer before design.
- Community guidelines: the master developer's design rules govern facades, colours, heights and materials.
- Added area counts as GFA: any increase in built-up area is reviewed as additional GFA.
- Approvals before work: work starts only after the NOC and the building permit are issued.
- Sign-off at the end: completion drawings and an inspection close the file.
Developer NOC
Community guidelines
Building Permit
Before work starts
Stamped Drawings
By our engineers
Why Owners Choose Structural Solutions
MAF NOC Experience
We prepare submissions to Majid Al Futtaim’s community requirements, so the NOC is right the first time.
DDA Permit Drawings In-House
Architectural and structural drawings and calculations prepared by our engineers for the DDA permit.
NOC to Completion
From the MAF NOC through the DDA permit to completion — one consultant for the whole approval.
Start Your Approval Today
Tell us about your villa and planned works — we will confirm the approvals, prepare the drawings and handle the submissions.
Who Approves Modifications in Ghaf Woods? — FAQs
Who approves modifications in Ghaf Woods?
Majid Al Futtaim (MAF), then DDA for structural works.
Who is the master developer of Ghaf Woods?
Majid Al Futtaim (MAF).
Who issues building permits in Ghaf Woods?
DDA, after the MAF NOC.
Do non-structural works need a DDA permit?
Usually not, but they still need the MAF NOC.
Can you handle it for me?
Yes — drawings, submissions and completion.
