As-built drawings are most commonly needed when regularising unauthorised construction, when selling a property with any history of modification, when applying for a completion certificate, and when planning a future renovation where accurate current drawings are essential for the new design.
What Are As-Built Drawings and Why Do I Need Them?
As-built drawings are structural and architectural drawings that show a property exactly as it was actually constructed, including any changes made during construction that differ from the original approved drawings. You need them for regularising unauthorised work, selling a property with modifications, or as a reference for any future renovation or extension work.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
When Do As-Built Drawings Differ From Original Approved Drawings?
As-built drawings differ from original approved drawings whenever changes were made during construction, whether due to site conditions, owner preference changes, or unauthorised modifications made after the original approval. Even minor deviations should be documented, since authorities and future buyers rely on as-built drawings to understand the property's true condition.
As-Built Drawing Preparation Process
01
Site Survey of Actual Structure
02
Compare Against Original Drawings (If Available)
03
Document All Deviations
04
Prepare As-Built Architectural Drawings
05
Prepare As-Built Structural Drawings
06
Certification by Registered Consultant
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
When Are As-Built Drawings Most Commonly Needed?
As-Built Drawing Scenarios We Handle
Unauthorised Work Regularisation
Pre-Sale Documentation
Completion Certificate Support
Renovation Planning Reference
Insurance Documentation
Community NOC Supporting Documents
What Are As-Built Drawings and Why Do I Need Them? at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Owners Choose Structural Solutions for As-Built Drawings
Accurate Site Surveys
We conduct precise site surveys to document the property exactly as it currently exists.
Authority-Accepted Format
We prepare as-built drawings in the format accepted by Dubai Municipality, DDA, or Trakhees as applicable.
Full Process Managed
We provide efficient as-built drawing preparation to support your timeline. Contact us on WhatsApp or email info@structuralsolutions.ae.
We Prepare Accurate As-Built Drawings for Your Property
Structural Solutions surveys your property and prepares certified as-built drawings for regularisation, sale, or future renovation planning.
As-Built Drawings — Frequently Asked Questions
Are as-built drawings the same as original approved drawings?
No, as-built drawings reflect the property exactly as constructed, which may differ from the originally approved plans if changes were made.
Do I need as-built drawings if nothing was changed from the original plans?
If the property matches the original approved drawings exactly, formal as-built drawings may not be necessary, though this should be confirmed.
What do you need from me to get started?
Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.
Can as-built drawings help me sell my property more easily?
Yes, having accurate as-built documentation can streamline the compliance verification process during a sale.
Do as-built drawings need to be stamped by a registered consultant?
Yes, for official purposes such as regularisation or authority submission, as-built drawings should be certified by a registered consultant.
