Wind load · Pergolas

Pergola Wind Load Calculation in Dubai

An open roof catches the wind. That decides the posts, connections and footings.

A pergola’s large, light roof is very sensitive to wind uplift and sideways load, so wind usually governs its design in Dubai: the post spacing, the member sizes, the connections and the footing or roof fixing. Developers ask for stamped calculations with the pergola NOC. Our engineers calculate the wind on your pergola at its location and height and size the members, connections and footings.

Pergola Wind Load Calculation in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Roof: Uplift
  • Posts: Spacing and size
  • Connections: Beams to posts
  • Footings: Or roof fixing
  • Height: Ground or roof
  • Report: Stamped

Documents you will need

  • Drawings or a sketch with sizes
  • Material and profile details
  • Location and height
  • Photos of the supporting structure

Process

How we prepare the calculations

The general process. We confirm what your submission needs.

StepApproval routeGuides
Details
You
Drawings, sizes, materials and location.—
Wind loads
Our engineers
Pressure and suction for the location and height.—
Members
Our engineers
Posts, beams and louvres sized for wind.—
Fixings
Our engineers
Connections and footings or roof fixings designed.—
Report
Structural Solutions
Stamped calculations and details.—
Submission
Approving body
With the NOC, permit or approval.—

How it works

How we work

1. Send us the details

Drawings, sizes and location.

2. Site

Height and supporting structure.

3. Loads

Wind pressure and suction.

4. Design

Members and fixings.

5. Report

Stamped calculations.

6. Submission

Comments answered.

Related questions

What causes problems

  • Footings too small
  • Weak connections
  • Roof slab not checked

Need wind load calculations?

Get a stamped report for your submission

Send us three things on WhatsApp:

  1. Structure and size
  2. Materials
  3. Location and height

Our engineers calculate the wind loads, check the fixings and prepare the report.

Questions

Questions

Do pergolas need wind load calculations?

Usually yes; developers ask for stamped calculations with the NOC.

Is a roof pergola different?

Yes. The roof slab and fixings are checked as well.

What if a pergola was damaged by wind?

We inspect it and design the repair or replacement.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading