Tilal Al Ghaf · Plagette 32 apartments

Plagette 32 Tilal Al Ghaf NOC: approvals for apartment changes

Plagette 32 Tilal Al Ghaf NOC: internal modifications in Plagette 32 apartments need the Majid Al Futtaim (MAF) NOC and a DDA permit, even for minor changes. Structural elements cannot be touched. We check your plan, prepare the drawings and handle both approvals.

Plagette 32 is the apartment building in Tilal Al Ghaf, the Majid Al Futtaim community. Any internal modification, even a minor one, needs the MAF NOC and then a DDA permit. Columns, beams, slabs and structural walls cannot be touched. Non-structural walls, kitchens and bathrooms can often be changed with approval. The cost depends on the works, so we review and advise.

Property typeApartments
Developer NOCMajid Al Futtaim (MAF)
PermitDDA, even for internal changes
StructureCannot be touched
Plagette 32 Tilal Al Ghaf NOC apartment approvals

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality (pool environmental NOC)

Plagette 32 Tilal Al Ghaf NOC: what needs approval

  • Internal walls: Non-structural walls only
  • Kitchen: Open kitchen, new layout
  • Bathrooms: Layout and plumbing
  • Flooring and ceilings: Internal modifications
  • Balcony: Façade: MAF decides
  • Structure: Not permitted

Documents you will need

  • Title deed and owner ID
  • Apartment plans from handover (or we survey)
  • Photos
  • Drawings (we prepare these)

By type of change

Plagette 32 Tilal Al Ghaf NOC by type of change

Internal modifications need MAF and DDA, even when minor.

ChangeApproval routeGuides
Remove or move a non-structural wall
MAF NOC → DDA permit
We confirm the wall is not structural first.Interior renovation
Kitchen or bathroom layout
MAF NOC → DDA permit
Services and wet areas checked.Interior works
Columns, beams, slabs, structural walls
Not permitted
Structural elements cannot be touched.—
Balcony or façade
MAF decides
Checked against the guidelines.Balconies

How it works

How we get your apartment works approved

1. Review

Your plan, photos and idea.

2. Check

Structural and non-structural walls.

3. Drawings

Layout drawings.

4. MAF NOC

Majid Al Futtaim approval.

5. DDA permit

Permit for the works.

6. Completion

Inspection after the works.

Common reasons for comments

  • Works touching structural elements
  • Wet areas moved without checks
  • Drawings that do not match the apartment
  • Works started before approval

Changing your Plagette 32 apartment?

Send your plan. We check what is possible.

Send us three things on WhatsApp:

  1. What you want to change
  2. Photos of the apartment
  3. The apartment plan, if you have it

We check which walls can change, the approvals needed and the cost for your scope.

Questions

Plagette 32 Tilal Al Ghaf NOC questions

Do I need approval for interior changes in my Plagette 32 apartment?

Yes. Internal modifications in Plagette 32 need the Majid Al Futtaim (MAF) NOC and a DDA permit, even when the change is minor.

Can I remove a wall in my Plagette 32 apartment?

Only a wall that is not structural. Structural elements such as columns, beams, slabs and structural walls cannot be touched in the apartment. We check which walls can be changed before design.

Who approves apartment modifications in Plagette 32?

Majid Al Futtaim first, through the MAF NOC, then DDA issues the permit. We prepare the drawings and handle both.

Is Plagette 32 under Dubai Municipality or DDA?

DDA, like the rest of Tilal Al Ghaf.

Can I open up my kitchen in Plagette 32?

Often yes, if the wall is not structural and the services can be moved. It still needs the MAF NOC and the DDA permit.

Can I change bathrooms or move plumbing?

Changes to bathrooms and plumbing are internal modifications: they need the MAF NOC and the DDA permit. Wet areas cannot be moved over rooms below without checking.

Can I close or change my balcony in Plagette 32?

The balcony is part of the building façade, so Majid Al Futtaim decides. We check the guidelines before any design.

Where do I get the plans of my apartment?

Use the plans from your handover documents. If you do not have them, we survey the apartment and prepare as-built drawings.

What happens if I modify my apartment without approval?

The works can be stopped and may have to be reversed, and unapproved changes cause problems when you sell or rent. Get the MAF NOC and DDA permit first.

How much does a Plagette 32 NOC and permit cost?

It depends on the works and the scope: an extension is not a pergola. Send us your idea, photos and any drawings you have, and we review them and advise.

What do you need from me to start?

Your title deed, the apartment plans if you have them, photos and a short description of the changes. We confirm what is possible and the approvals.