Al Reem Arabian Ranches 1 NOC: What Can I Change?
An Al Reem Arabian Ranches 1 NOC comes from Emaar. Structural works then need a DDA building permit, and we prepare the drawings and handle both.
Al Reem is a cluster in Arabian Ranches 1, an Emaar community. Works need an Emaar NOC and, for structural changes, a DDA building permit. For extensions, Emaar reviews each villa and townhouse separately, so ask us and we will advise on your case. Garages stay parking and front balconies cannot be closed. Emaar provides the as-built plans, and our engineers prepare the drawings and stamped calculations.
Emaar’s guide
Al Reem: what Emaar’s guide allows
From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application, and we confirm whether your unit follows the villa or townhouse rules.
| Item | Villa | Townhouse |
|---|---|---|
| Extension | Depends on your villa and plot; Emaar reviews each case | Depends on the unit; Emaar reviews each case |
| First floor | Ask us: we advise on each villa | Not allowed |
| Maid or driver room | Side alley, 3 m offset or as the affection plan allows | End and corner units only |
| Garage | Stays parking; approved side screens and folding doors | Stays parking; no roll-up doors or extra parking |
| Balcony | Rear can be closed. Front cannot | Elevation and railings kept |
| Pool | 1.5 m from the boundary wall and the villa | 1.5 m from the boundary wall |
| Pergola | 1.2 m from the boundary, 20 m² or 15% of the plot | 0.6 m from the limits, 20 m² on standard plots |
| Emaar GFA rate | AED 1,000 per sq ft up to 10%; AED 3,000 to AED 6,000 above, subject to Emaar Management approval | AED 1,000 per sq ft, subject to Emaar review |
| Route | Emaar NOC, then DDA permit | Emaar NOC, then DDA permit |
Official sites: Emaar · Dubai Development Authority (DDA)
What we check in Al Reem
- Unit type: Whether your Al Reem home follows the villa or townhouse rules.
- GFA: The original area and any earlier additions.
- Setbacks: Where an extension, pool or pergola can go on your plot.
- Structure: Walls, slabs and foundations before any opening or new load.
- Earlier works: Older changes are surveyed and approved before new works.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan (independent villas)
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea against Emaar’s guide and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Arabian Ranches
Dubai Development Authority (DDA)
Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.
Is Arabian Ranches under DDA? →Structural Solutions
Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.
Arabian Ranches approval guide →Why applications come back
- Design does not follow Emaar’s guide
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask
Do I need an NOC in Al Reem?
Yes, an Emaar NOC, and a DDA permit for structural works.
Is Al Reem under DDA or Dubai Municipality?
DDA issues the building permit in Arabian Ranches.
How much can I extend in Al Reem?
There is no single figure. Emaar reviews each case, so ask us and we will advise on your villa.
Can I convert my garage in Al Reem?
No, garages and carports must stay parking.
Can you get my plans?
Emaar provides the as-built plans. If they are missing, we survey and redraw.
Related guides
