Outside Consultant Stamp for Mall Submission Dubai

Need an outside, UAE-licensed consultant to review and stamp drawings for mall submission? Structural Solutions provides independent stamping for tenants, contractors, and design teams.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

When You Need an Outside Consultant Stamp

Tenants and contractors often need an outside consultant — separate from their own design or project team — to independently review and stamp drawings before mall submission. This is common when your in-house team isn't a UAE-licensed structural consultancy, or when the mall specifically requires an external, registered stamp.

Outside Consultant Stamp Process

01

Diagnose the Issue

02

Consultant Review & Re-Stamp

03

Corrected Resubmission

04

Mall Management Review

05

Authority Review (If Applicable)

06

Approval & Sign-Off

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Who Typically Needs This Service

We provide outside consultant stamping for a range of project teams:

Who We Work With

Tenant Design & Fit-Out Teams

Main & Fit-Out Contractors

Architects Without Structural Licensing

Project Management Consultancies

International Design Teams

Retail & F&B Operators

Simple Approval Process

How Our Approval Process Works

We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.

Decorative line divider graphic

Quick Review

We review drawings and project requirements fast.

Plan Design

Our team prepares compliant
drawings and files.

Decorative line divider graphic

Easy Submit

We submit documents to
Dubai authorities safely.

Decorative line divider graphic

Final Permit

Receive approvals and
permits without delays.

Shopping Mall in Dubai

Proven track record

Across Dubai's leading malls and retail destinations

Established firm

Years of structural engineering experience in Dubai

Highly rated

By mall management teams and tenants alike

Why Project Teams Choose Structural Solutions

Fast Turnaround

We prioritise urgent fit-out and rejection cases to get you back on schedule quickly.

UAE-Licensed Engineers

Every stamp carries a registered engineer's authority number, accepted by malls and Dubai authorities.

Direct Problem-Solving

We diagnose exactly why a submission was rejected or delayed, not just resubmit the same drawings.

Get an Outside Consultant Stamp for Your Drawings

Structural Solutions provides independent, UAE-licensed consultant stamping for mall submissions across Dubai.

Outside Consultant Stamp — FAQs

Why would I need an outside consultant if I already have a design team?

Because the stamp must come from a UAE-licensed structural engineering consultancy — if your design team isn't one, you need an outside consultant to review and stamp the drawings.

Do you redesign the drawings, or just review and stamp them?

We review your existing drawings first; if they meet the required standard, we stamp them, otherwise we advise on the changes needed.

Can you work with our existing architect or contractor?

Yes — we regularly work alongside architects, contractors, and project managers as the outside structural consultant.

Is an outside consultant stamp accepted by all Dubai malls?

Most malls accept a stamp from any UAE-licensed consultant registered with the correct authority for that mall's jurisdiction.

How do we get started?

Send us your current drawing set and we'll confirm what's needed for a valid stamp and submission.