Restaurant Fit-Out Stamp for Mall Approval in Dubai
Most Dubai malls ask for restaurant fit-out drawings stamped by a consultant before they approve. We prepare and stamp the structural drawings and calculations, and the architectural and MEP drawings where the mall asks, then handle the authority, Food Safety and DCD approvals that follow.
The mall approves first. Then the authority for the mall (Dubai Municipality or DDA, or Trakhees for Nakheel malls) issues the permit for structural works, DM Food Safety approves the layout and DCD approves the fire safety.
By mall
Route after the mall approval
A guide. We confirm your mall first.
| Mall | Authority |
|---|---|
| Mall of the Emirates | Dubai Municipality |
| Dubai Mall | Emaar, then Dubai Municipality |
| Dubai Hills Mall | DDA |
| Nakheel malls | Trakhees |
| Dubai Outlet Mall | See Outlet Mall restaurant |
Drawings
What malls usually ask to be stamped
| Drawing | When |
|---|---|
| Structural drawings and calculations | Openings, mezzanines, heavy equipment |
| Architectural layout | Most fit-outs |
| MEP drawings | Kitchen exhaust, drainage, power |
| As-built drawings | At handover |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- Mall first.
- Stamp by a consultant.
- Authority depends on the mall.
- Food Safety and DCD for every restaurant.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout
- Photos of the unit and the area
- Mall fit-out guidelines
- Contractor drawings if any
How it works
How we handle it
1. Mall rules
Their checklist.
2. Drawings
Prepared or reviewed.
3. Stamp
Drawings and calculations.
4. Mall approval
Submitted.
5. Authority, Food Safety, DCD
In order.
6. Handover
Inspection.
Questions
Questions owners ask
Why does the mall need a consultant stamp?
Malls ask for stamped drawings so a consultant takes responsibility for the design.
Can my fit-out contractor stamp the drawings?
See contractor stamps.
Is mall approval enough?
No. The authority, Food Safety and DCD still approve.
Who can help?
We prepare the drawings and stamped calculations and submit the approvals for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
