Villas · Built-up area

Why the BUA on Your Title Deed Can Differ From the Actual Space

The title deed shows what was registered, not always what is built.

The built-up area (BUA) on a Dubai title deed reflects what was approved and registered. Rooms, enclosed balconies, converted garages or extensions added later usually do not appear on it unless they were approved and the records were updated. So the real built area can be larger than the title deed. When buying, extending or selling, we compare the title deed, the approved drawings and a site survey and tell you what is on record and what is not.

Why the BUA on Your Title Deed Can Differ From the Actual Space

Official sources: Dubai Municipality · DDA

What we check

  • Title deed: Registered BUA
  • Drawings: Approved
  • Site: Measured
  • Additions: Since handover
  • Records: Updated or not
  • Next: Buy, extend or sell

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Existing drawings, if available
  • Photos and a short description

Route

How we compare the BUA

The general route. We confirm it for your project.

StepApproval routeGuides
Title deed
You
The registered built-up area.—
Approved drawings
Developer or authority
What was approved.—
Survey
Our engineers
What is built today.As-built survey
Comparison
Our engineers
Differences listed.—
Finding
Structural Solutions
What is on record and what is not.—
Next step
You
As-built route or proceed.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Design

Drawings and calculations by our engineers.

5. Submission

By us.

6. Follow-up

Comments until approval.

What causes problems

  • Buying on the title deed alone
  • Additions never recorded
  • Valuation surprises

Need help with this?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any drawings you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Why is my villa bigger than the title deed?

Later additions are usually not on it unless approved and recorded.

Does it matter when selling?

It can, with the buyer, the bank and the developer.

What if additions were never approved?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading