Al Quoz Mezzanine Permit: Dubai Municipality Approval for Warehouses
A mezzanine in an Al Quoz warehouse is approved by Dubai Municipality, after the landlord NOC and before it is built.
In Al Quoz, a warehouse mezzanine needs the landlord NOC, then a Dubai Municipality building permit (modification) with stamped structural calculations, the stamp of an approved steel contractor for the steel, Dubai Civil Defence approval, and the DM completion after the works. The mezzanine counts as added floor area. The same route applies in Ras Al Khor and Al Warsan.
What you need to know
- Landlord first: The landlord NOC is the first document.
- DM permit: A building permit (modification) with stamped calculations.
- Steel stamp: The approved steel contractor stamps the steel.
- Civil Defence: DCD approves the fire safety and escape.
- Completion: DM completion after the works.
Documents you will need
- Trade licence and tenancy contract, or title deed for owners
- Landlord, building management or master developer NOC
- Existing or as-built drawings of the unit or villa
- Mezzanine drawings with stamped structural calculations
- Fire safety drawings for Civil Defence
By situation
Route in Al Quoz
We confirm the route for your building and area.
| Step | Approval route | Guides |
|---|---|---|
| 1. Landlord NOC Landlord | For the mezzanine. | — |
| 2. DM building permit Dubai Municipality | With stamped calculations. | Calculations |
| 3. Steel stamp Approved steel contractor | Also called a steel specialist. | Steel contractor |
| 4. Civil Defence DCD | Fire safety and escape. | — |
| 5. Completion Dubai Municipality | After the works. | Sign-off |
How it works
How we get your mezzanine approved
1. Site and slab review
The unit, the existing slab and columns, and what the mezzanine is for.
2. Existing drawings
From the landlord, developer or authority; if missing or out of date, we survey and draw as built.
3. Design and calculations
Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.
4. NOC
Landlord, building management or master developer NOC.
5. Permit and Civil Defence
The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.
6. Build, inspect, complete
The mezzanine is built as approved, inspected, and the completion certificate is issued.
Who does what
Who approves a mezzanine
Landlord or developer
Gives the NOC for the mezzanine. It comes first.
Authority for the area
Dubai Municipality, DDA, Trakhees, DSO Authority, Dubai South Authority or DMCC approves the structure with stamped calculations.
Who approves? →Approved steel contractor
A steel mezzanine needs the stamp of an approved steel contractor (also called a steel specialist).
Steel contractor stamp →Dubai Civil Defence
Every mezzanine needs DCD approval for fire safety and escape.
What we prepare
- Survey and as-built drawings of the warehouse
- Mezzanine drawings and stamped calculations
- DM and DCD submissions
Why mezzanine submissions get returned
- Mezzanine built before approval
- No landlord or developer NOC
- Drawings that do not match the unit as built
- Slab and columns not checked for the new loads
- Steel without the approved steel contractor stamp
- Added floor area not shown
- No Civil Defence fire safety drawings
Questions
Questions owners and tenants ask
Who approves a mezzanine in Al Quoz?
Dubai Municipality, after the landlord NOC, with Civil Defence approval.
Is the route the same in Ras Al Khor and Al Warsan?
Yes, Dubai Municipality is the authority there too.
Does an Al Quoz mezzanine count as floor area?
Yes, it counts as added GFA.
Can I build first and approve later?
No. It must be approved first; otherwise a retrospective approval is needed.