As-Built Drawings for The Meadows Villas
As-built drawings for The Meadows villas show the villa as it stands today. We obtain the existing drawings or survey the villa and redraw it, in PDF and CAD.
The short answer
As-built drawings record a Meadows villa as it is now. Emaar provides the original as-built plans, and where the villa has changed or plans are missing, we survey the villa and redraw it. They are used for new works, regularising old changes, and selling. Delivered in PDF and CAD.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs and foundations before any opening or new load.
- Existing floor area: measured from the as-built plans, so the extension percentage is right.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number (Meadows 1 to 9)
- Title deed and owner ID
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Who does what
The approval route in The Meadows
Emaar first, then Dubai Municipality. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | As-built drawings, The Meadows |
| Emaar NOC Emaar Community Management | NOC through the Emaar Community Portal. Emaar reviews the design against The Meadows guidelines and confirms its fees. | Emaar extension fees |
| Permit Dubai Municipality | Building permit for structural works, submitted by an approved consultant. | The Meadows building permit |
| Inspections Emaar and Dubai Municipality | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Municipality | Completion certificate that closes the permit; Emaar then closes its file. | Meadows extension sign-off |
How it works
How it works in The Meadows
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Emaar as-built plans, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Municipality permit where the works are structural.
Guides for works in The Meadows
What each work needs in The Meadows
- Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Municipality permit
- Balcony closure: Emaar NOC, Dubai Municipality permit; it adds floor area
- Pergola or car shade: Emaar NOC and stamped calculations
- Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
- Garage conversion: Emaar NOC; permit where walls or openings change
- Internal finishes only: Emaar NOC for the works and the developer inspection
Questions
As-built drawing questions in The Meadows
Where do I get my Meadows villa drawings?
Emaar provides the as-built plans. We request them and check them against the villa.
What if the villa has changed since?
We survey the villa and redraw it as it stands today.
What format do I receive?
PDF and CAD.
When do I need as-built drawings?
For new works, for regularising earlier changes, and when selling a villa with changes.
Last checked: October 2026. Official sources: Emaar · Dubai Municipality · Dubai Civil Defence
Related guides
