Emaar · Drawings

As-Built Drawings for an Emaar NOC

Emaar reviews your NOC against your villa’s plans. If they are missing or out of date, we fix that first.

Emaar provides the as-built plans for most of its villas, and the NOC drawings are based on them. When the plans are missing, or the villa has changed since handover, we survey the villa and prepare new as-built drawings so the NOC is based on what is actually there. We prepare them in the format the next authority needs: Dubai Municipality in Emirates Living, DDA in Dubai Hills, Arabian Ranches and The Valley.

As-Built Drawings for an Emaar NOC

Official sources: Dubai Municipality · DDA

What we check

  • Plans: From Emaar
  • Changes: Since handover
  • Survey: If needed
  • Format: DM or DDA
  • Area: GFA measured
  • Files: PDF and CAD

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Existing drawings, if available
  • Photos and a short description

Route

From Emaar plans to NOC

The general route. We confirm it for your project.

StepApproval routeGuides
Request
Structural Solutions
Plans from Emaar on your behalf.—
Compare
Our engineers
Plans against the villa.—
Survey
Our engineers
Where plans are missing or out of date.As-built survey
Drawings
Structural Solutions
As-built set in the right format.—
Emaar NOC
Emaar
Submitted with your proposed works.—
Permit
DM or DDA
By community.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Design

Drawings and calculations by our engineers.

5. Submission

By us.

6. Follow-up

Comments until approval.

What causes problems

  • Designing from outdated plans
  • Unapproved changes not shown
  • Wrong authority format

Need help with this?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any drawings you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Does Emaar give the plans?

Yes, for most villas; we request them for you.

What if the villa was changed?

We survey it; older unapproved changes may need the as-built route.

Which format?

Dubai Municipality in Emirates Living, DDA in Dubai Hills, Arabian Ranches and The Valley.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading