Drawings · As-built survey

As-Built Survey in Dubai

When the approved drawings are missing or the property has changed, we survey it and draw it as it is today.

An as-built survey records a property exactly as it stands: our engineers measure every floor, the outside walls and the structure, then prepare architectural and structural as-built drawings. It is needed when the approved drawings are missing, the property has changed since handover, or before an extension, wall removal, regularisation or completion. We first try to obtain the existing approved drawings for you; if there are none, or they no longer match, we survey. You receive PDF, and CAD where applicable.

As-Built Survey in Dubai

Official sources: Dubai Municipality · DDA

What we check first

  • Floors: Measured room by room
  • Walls and openings: Positions and sizes
  • Structure: Columns, beams, slabs
  • Changes: Against approved drawings
  • Format: Developer or authority format
  • Files: PDF and CAD

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Affection plan or plot number
  • Existing drawings, if available

Route

From existing drawings to as-built set

The general route. We confirm it for your property.

StepApproval routeGuides
Obtain existing drawings
Structural Solutions
We request the approved drawings from the developer or authority on your behalf.Getting your drawings
Site survey
Our engineers
Measured survey of every floor and the structure.—
Architectural drawings
Structural Solutions
Plans, elevations and sections as built.—
Structural drawings
Structural Solutions
Columns, beams, slabs and wall types.—
Comparison
Our engineers
Differences from the approved drawings, if any.—
Use
You and the authorities
NOC, permit, GFA, buying or selling.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Drawings

Prepared by our engineers.

5. Submission

By us, to each body.

6. Follow-up

Comments until approval.

What causes problems

  • Designing from old plans
  • Changes since handover not shown
  • Area measured wrongly

Need this approval?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any documents you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Do I always need a survey?

No. If the approved drawings exist and match the property, we obtain them for you.

What do you need from me?

Title deed, Emirates ID or passport and a signed authorisation letter.

Which properties?

Villas, apartments, shops, offices and warehouses, anywhere in Dubai.

What if the survey shows unapproved works?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading

Related

More on this topic