The Valley Villa Types and Extension Guide
The Valley villa types and extension guide: townhouse and villa sizes vary by cluster, so how much you can add is checked against your villa’s Emaar as-built plans, not a generic figure.
The Valley by Emaar has several clusters, including Eden, Elora, Nara, Orania, Nima, Talia, Alana, Lillia, Rivana and Farm Gardens. Layouts and sizes vary between them, so we don’t use generic type figures. Emaar provides the as-built plans; we measure your home from them and on site. There is no fixed extension figure we can promise for The Valley. Emaar Community Management reviews each extension against your villa’s approved plans and the community guidelines, and we check your villa before you design.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing floor area: measured from the Emaar as-built plans and on site, so the design matches what Emaar can approve.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in The Valley
- Title deed and owner ID
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Who does what
The approval route in The Valley
The Valley follows Emaar first, then the Dubai Development Authority (DDA) permit for structural works. We confirm the route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | — |
| Emaar NOC Emaar Community Management | NOC. Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Development Authority (DDA) | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Emaar and Dubai Development Authority (DDA) | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Development Authority (DDA) | Completion certificate that closes the permit; Emaar then closes its file. | — |
How it works
How it works in The Valley
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Emaar as-built plans, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Development Authority (DDA) permit where the works are structural.
Guides for works in The Valley
What each work needs in The Valley
- Extension: Emaar NOC, Dubai Development Authority (DDA) permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Development Authority (DDA) permit
- Balcony closure: Emaar NOC and Dubai Development Authority (DDA) permit; it adds floor area
- Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Emaar NOC, Dubai Development Authority (DDA) permit and the DM environmental NOC
- External colour or façade: Emaar NOC
- Internal finishes only: usually no permit; check with Emaar first
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask in The Valley
Which clusters are in The Valley?
Clusters include Eden, Elora, Nara, Orania, Nima, Talia, Alana, Lillia, Rivana and Farm Gardens.
Is there a fixed extension size per cluster?
No published figure we can rely on. Emaar Community Management reviews each extension against the home’s approved plans and the community guidelines.
How is my home’s area measured?
From the Emaar as-built plans and a site check.
Who approves an extension?
Emaar gives the NOC, then the Dubai Development Authority (DDA) issues the building permit for structural works.
Is the route the same in every cluster?
Yes: Emaar NOC, then DDA.