The Lakes · Emaar · Villa

The Lakes Villa Types and Extension Guide

The Lakes villa types and extension guide: The Lakes has six sub-communities, and how much you can extend depends on your villa’s existing floor area, measured from the Emaar as-built plans.

The Lakes, part of Emirates Living, has six sub-communities: Deema, Forat, Ghadeer, Hattan, Maeen and Zulal. Villa layouts and sizes vary across them, so we don’t rely on generic type figures; we measure your villa’s existing floor area from the Emaar as-built plans and on site. Villas in The Lakes can usually extend by around 10% of the existing floor area, and going beyond 10% is possible, subject to Emaar Community Management approval. It depends on the villa and the plot.

Developer NOCEmaar NOC
AuthorityDubai Municipality
PlansEmaar provides as-built plans
Villas by the lake in The Lakes, Emirates Living, Dubai
The Lakes, Emirates Living, Dubai
The Lakes villa types

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the as-built plans, so the extension allowance is right.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in The Lakes
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in The Lakes

The Lakes is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in The Lakes

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in The Lakes

  • Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

The Lakes villa types

Questions

Questions owners ask in The Lakes

Which sub-communities are in The Lakes?

Deema, Forat, Ghadeer, Hattan, Maeen and Zulal.

Are all Lakes villas the same?

No. Layouts and sizes vary, so each villa is measured from its as-built plans.

How much can I extend?

Villas in The Lakes can usually extend by around 10% of the existing floor area, and going beyond 10% is possible, subject to Emaar Community Management approval. It depends on the villa and the plot.

How is my villa’s area measured?

From the Emaar as-built plans and a site check.

Is the approval route the same in every sub-community?

Yes. Across The Lakes: Emaar NOC, then Dubai Municipality.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading