Dubai Hills Villa Extension: NOC, Fees and DDA Permit
A Dubai Hills villa extension needs an Emaar NOC, then a DDA building permit. What you can add depends on your villa, so ask us and we will advise on your case.
A Dubai Hills villa extension needs an Emaar NOC, then a DDA building permit with stamped drawings and calculations. What you can add depends on your villa, your plot and Emaar’s review, so each case is different. Send us your villa type and your idea, and we will advise on your case. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, and AED 3,000 to AED 6,000 per sq ft above 10%, subject to Emaar Management approval.
Extensions
What Emaar looks at for an extension
There is no single figure for Dubai Hills. Emaar reviews each case, so ask us and we will advise on your villa.
| Item | What to expect |
|---|---|
| Size and location | Depends on your villa, your plot and Emaar’s review. |
| Look | Same theme, materials, openings and colours as the villa. |
| Structure | Works must not damage structural elements. Our engineers check this first. |
| Added GFA | Emaar charges on the added area. See the fee table. |
| Next step | Send us your villa type and idea, and we will advise on your case. |
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Larger plots: Often have more room, but Emaar reviews each villa.
- Townhouses: Usually have less room. A neighbour NOC may be needed.
- Enclosures: Closed terraces and balconies add GFA.
- Golf Place, Sidra, Maple, Hills Grove: The route is the same across Dubai Hills.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I extend my Dubai Hills villa?
It depends on your villa, plot and Emaar’s review. Ask us and we will advise on your case.
Who approves it?
Emaar issues the NOC, then DDA the building permit.
How much does Emaar charge?
AED 1,000 per sq ft of added GFA up to 10%, AED 3,000 from 10% to 20% and AED 6,000 above 20%, subject to Emaar Management approval.
Can I add a second floor?
It depends on the villa and its structure, so we check it first.
Is the route different in Sidra or Golf Place?
No, it is the Emaar NOC, then the DDA permit.
Related guides
Keep reading
Related
