DCD Approval for Restaurants in Dubai
Every restaurant in Dubai needs Dubai Civil Defence (DCD) approval: for a new opening, a fit-out, an extension, a kitchen change, a shisha or smoking area, and a takeover. DCD reviews fire and life safety in the layout and inspects before the restaurant opens.
DCD looks at exits and travel distances, seat numbers, fire alarm and sprinkler coverage, the kitchen hood and suppression, and gas. Gas works are done by a DCD-approved contractor. We prepare the drawings and submit them.
When DCD applies
Restaurant cases that need DCD
| Case | DCD point |
|---|---|
| New restaurant | Full fire and life safety review |
| Extension or more seats | Exits for the new numbers; see DCD for extensions |
| Kitchen change | Hood, suppression and gas |
| Shisha or smoking area | DCD approval of the area |
| Takeover | Approval in the new owner's name |
What is reviewed
What DCD looks at in a restaurant
| Item | Why |
|---|---|
| Exits and routes | People leave safely |
| Fire alarm and sprinklers | Cover the whole restaurant |
| Kitchen hood and suppression | Grease fire risk |
| Gas | Installed by a DCD-approved contractor |
| Materials | Finishes and ceilings |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- Every proposal needs DCD.
- Gas by a DCD-approved contractor.
- Inspection before opening.
- We submit the drawings.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout
- Photos of the unit and the area
- Fire alarm and sprinkler layouts if available
How it works
How we handle it
1. Scope
What is changing.
2. Drawings
Layout and fire drawings.
3. Submit
To DCD.
4. Comments
Answered.
5. Works
By approved contractors.
6. Inspection
Before opening.
Already done
Works done before DCD approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions owners ask
Does every restaurant need DCD approval in Dubai?
Yes. Every restaurant, shisha or smoking area proposal needs Dubai Civil Defence approval.
What does DCD check in a restaurant?
Exits, seat numbers, fire alarm and sprinklers, the kitchen hood and suppression, and gas.
Who installs the gas?
A DCD-approved contractor.
Can I open before the DCD inspection?
No. The restaurant is inspected before it opens.
Who can help?
We prepare the drawings and stamped calculations and submit the approvals for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides

