Restaurants · DCD · Updated November 2026

DCD Approval for Restaurants in Dubai

Every restaurant in Dubai needs Dubai Civil Defence (DCD) approval: for a new opening, a fit-out, an extension, a kitchen change, a shisha or smoking area, and a takeover. DCD reviews fire and life safety in the layout and inspects before the restaurant opens.

DCD looks at exits and travel distances, seat numbers, fire alarm and sprinkler coverage, the kitchen hood and suppression, and gas. Gas works are done by a DCD-approved contractor. We prepare the drawings and submit them.

WhenEvery restaurant proposal
WhatExits, alarm, sprinklers, kitchen, gas
EndInspection before opening

When DCD applies

Restaurant cases that need DCD

CaseDCD point
New restaurantFull fire and life safety review
Extension or more seatsExits for the new numbers; see DCD for extensions
Kitchen changeHood, suppression and gas
Shisha or smoking areaDCD approval of the area
TakeoverApproval in the new owner's name

What is reviewed

What DCD looks at in a restaurant

ItemWhy
Exits and routesPeople leave safely
Fire alarm and sprinklersCover the whole restaurant
Kitchen hood and suppressionGrease fire risk
GasInstalled by a DCD-approved contractor
MaterialsFinishes and ceilings

Official sites: Dubai Municipality | Dubai Civil Defence | DDA

What you need to know

  • Every proposal needs DCD.
  • Gas by a DCD-approved contractor.
  • Inspection before opening.
  • We submit the drawings.

Documents you will need

  • Trade licence
  • Tenancy contract or Ejari
  • Currently approved food layout
  • Photos of the unit and the area
  • Fire alarm and sprinkler layouts if available

How it works

How we handle it

1. Scope

What is changing.

2. Drawings

Layout and fire drawings.

3. Submit

To DCD.

4. Comments

Answered.

5. Works

By approved contractors.

6. Inspection

Before opening.

Already done

Works done before DCD approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Questions owners ask

Does every restaurant need DCD approval in Dubai?

Yes. Every restaurant, shisha or smoking area proposal needs Dubai Civil Defence approval.

What does DCD check in a restaurant?

Exits, seat numbers, fire alarm and sprinklers, the kitchen hood and suppression, and gas.

Who installs the gas?

A DCD-approved contractor.

Can I open before the DCD inspection?

No. The restaurant is inspected before it opens.

Who can help?

We prepare the drawings and stamped calculations and submit the approvals for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading