When do I need a road diversion permit in Dubai?

When your works block or change traffic on a road, for example for deliveries, cranes or works outside the plot.

The short answer

You need an RTA road diversion permit when your works block, narrow or change traffic on a public road, for example for crane lifts, large deliveries, utility connections or construction works outside the plot. The application includes a traffic diversion layout. Structural Solutions prepares the drawings and applies to RTA for the permit.

WhenWorks affect traffic
Issued byRTA
IncludesTraffic diversion layout

What you need to know

  • Lane closures: Need RTA approval too.
  • Drawings: Traffic layout for the diversion.
  • Before works: The permit comes first.
  • Plot access: Driveways follow the RTA access route.

Documents you may need

  • Title deed or trade licence
  • Affection plan or site plan
  • Site survey and drawings in DLTM
  • Developer NOC where applicable

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Drawings
Structural Solutions
Layouts and drawings, in DLTM coordinates where required.—
RTA application
Consultant → RTA
The RTA NOC or permit for the works.RTA approvals
Works
Contractor
Carried out as approved.—
Close-out
RTA
Inspection and refund of any security deposit.Deposit refund

Questions

Related questions

Do I need a permit for a crane on the road?

Yes, if it affects traffic.

Is a lane closure the same?

It is a related RTA permit.

Who prepares the drawings?

We do.

Can works start before the permit?

No.