Floor Area · BUA and GFA

What is BUA, and how is it different from GFA?

BUA is the built-up area of a property; GFA is the gross floor area that planning and developer rules count. Which areas each includes depends on the developer and authority guidelines.

The short answer

BUA (built-up area) is the area of a property that is built, while GFA (gross floor area) is the floor area that planning and developer rules count towards the limits for a plot. The two are often different, because some spaces may be counted in one and not the other, and the exact definitions depend on the developer and authority guidelines for your community. Extensions, enclosed areas, garden suites and mezzanines usually add GFA. Structural Solutions measures both from your drawings for the application.

BUABuilt-up area
GFAGross floor area counted by the rules
DefinitionsSet by the developer and authority

What you need to know

  • Why it matters: Extension limits and charges are based on the floor area counted.
  • Adds GFA: New rooms, enclosed areas, garden suites and mezzanines.
  • Check first: Each community has its own guidelines.
  • Measured from drawings: We measure the existing and added area.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Check what is allowed
Structural Solutions
Community guidelines, floor area and the existing structure.GFA rules
Drawings and calculations
Structural Solutions
Architectural drawings and stamped structural calculations.Structural calculations
Developer NOC
Developer
Where the community has a developer.Developer approvals
Building permit
Approved consultant → DM, DDA or Trakhees
Depending on the area.Approvals
Inspection and completion
Developer and authority
Owner letter and completion certificate.Sign-off

Questions

Related questions

Does a mezzanine add GFA?

Yes, a mezzanine counts as added GFA.

Does a garden suite count as GFA?

Yes.

Why do developers charge on GFA?

Extension charges are based on the added floor area.

Where do I find my villa's GFA?

In the approved drawings, which we can obtain for you.

Related guides

Keep reading