Trakhees CED Wall Removal Approval

Structural wall removal within JAFZA, Nakheel-master-planned communities, and other Trakhees-regulated developments require a Trakhees CED (Civil Engineering Department) approval before work begins. Structural Solutions prepares the structural drawings and manages the complete Trakhees CED submission for wall removal projects.

What is Trakhees CED Approval for Wall Removal?

Trakhees CED approval for wall removal is issued by the Civil Engineering Department of Dubai's Ports, Customs & Free Zone Corporation, which regulates JAFZA and several Nakheel-developed communities including Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, and Jumeirah Islands. Structural wall removal must be reviewed against Trakhees CED structural and safety standards before a permit is issued.

Load-Bearing CheckBefore any removal
Beam DesignStamped calculations
NOC + PermitCommunity and authority

What you need to know

  • When Do You Need Trakhees CED Approval for Wall Removal?: Trakhees CED approval is required before any wall removal work begins within a Trakhees-regulated plot or community. Structural calculations and drawings must be prepared by a UAE-licensed engineer and submitted in Trakhees CED format. Starting work without approval risks a stop-work order and can complicate future inspections and sign-off.
  • Load-bearing check: every wall is assessed before removal — never assumed.
  • New beam or lintel: a load-bearing wall needs a designed beam with stamped calculations.
  • Temporary propping: the structure above is supported while the wall is removed.
  • Partitions still need a NOC: non-structural walls can still require the community NOC.
  • Inspection after works: the opening is checked against the approved drawings.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing approved drawings — or an as-built survey if you have none
  • Photos of the wall and the rooms on both sides
  • Proposed drawings and stamped structural calculations

At a glance

Trakhees CED Wall Removal Approval at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Confirms whether the wall is load-bearing and designs the beam or lintel with stamped calculations.—
Nakheel (master developer)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

Trakhees CED Wall Removal Approval Process

Scope Assessment & Trakhees CED Requirements Review

Structural Drawings Prepared to Trakhees CED Format

Trakhees CED Portal Submission

Trakhees CED Technical Review

Fee Payment & Approval Issuance

Works Cleared to Proceed

Who does what

Who does what

🏘️

Master developer

Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.

Trakhees communities →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

What Trakhees CED Reviews for Wall Removal

  • Structural Load & Safety Compliance
  • Drawing Format & Documentation Standards
  • Site & Boundary Compliance
  • Registered Engineer Verification
  • Fee Assessment
  • Inspection & Sign-Off Requirements

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Developer NOC missing
  • Unapproved works already on site
  • Missing owner documents

Questions

Questions owners ask

Who issues approval for wall removal in Trakhees-regulated areas?

The Civil Engineering Department (CED) of Trakhees, which oversees JAFZA and Nakheel-developed communities including Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, and Jumeirah Islands.

Does Trakhees CED use different drawing standards than DDA or DM?

Yes. Trakhees CED has its own drawing format and documentation requirements, distinct from DDA and Dubai Municipality standards.

What happens if wall removal work starts without Trakhees CED approval?

The work is considered unauthorized and may be issued a stop-work order, with regularisation required before it can be signed off.

Can Structural Solutions handle the full Trakhees CED approval process?

Yes. We prepare structural drawings and calculations, manage the CED portal submission, and carry the project through to approval issuance.