Trakhees CED Structural Calculations
Trakhees CED structural calculations are the engineering load and safety calculations that must accompany any structural submission to CED. Structural Solutions prepares the documentation and manages the complete submission for clients across JAFZA and Nakheel-developed communities regulated by Trakhees CED.
What is Trakhees CED Structural Calculations?
Trakhees CED structural calculations are the engineering load and safety calculations that must accompany any structural submission to CED. Trakhees CED — the Civil Engineering Department of Dubai's Ports, Customs & Free Zone Corporation — regulates JAFZA and several Nakheel-developed communities including Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, and Jumeirah Islands, using its own drawing format and documentation standards distinct from DDA and Dubai Municipality.
What you need to know
- Who Needs Trakhees CED Structural Calculations?: Any owner, contractor, or tenant carrying out structural, warehouse, or plot works within a Trakhees-regulated community or JAFZA plot needs to go through this process. Documentation must be prepared by a UAE-licensed engineer and submitted in Trakhees CED's required format.
- Registered engineer: calculations are stamped by an authority-registered consultant.
- Loads to code: dead, live and wind loads to the applicable codes.
- Connections designed: fixings, base plates and connections are included.
- Existing structure checked: where new loads are added to an existing building.
- Match the drawings: calculations must match the drawings submitted.
Documents you will need
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Architectural or shop drawings of the element
- Existing structural drawings, if available
At a glance
Trakhees CED Structural Calculations at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Prepares the structural design and calculations and stamps them as an authority-registered consultant. | — |
| Nakheel (master developer) Step 2 | Issues the community NOC against its design guidelines. | — |
| Building authority — Trakhees Step 3 | Building permit; work starts only after it is issued. | — |
| Developer and authority Step 4 | Completion inspection and sign-off. | — |
How it works
How Trakhees CED Structural Calculations Works
Scope Assessment & Documentation Review
Structural Drawings Prepared to Trakhees CED Format
Trakhees CED Portal Submission
Trakhees CED Technical Review
Fee Payment & Issuance
Approval Confirmed
Who does what
Who does what
Master developer
Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.
Trakhees communities →Trakhees
Civil Engineering Department (CED): building permit for structural works and inspection at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits for you as the approved consultant.
Talk to our engineers →What Trakhees CED Reviews
- Structural Load & Safety Compliance
- Drawing Format & Documentation Standards
- Site & Boundary Compliance
- Registered Engineer Verification
- Fee Assessment
- Inspection & Sign-Off Requirements
Why applications come back
- Drawings not in the format Trakhees asks for
- No stamped structural calculations
- Developer NOC missing
- Unapproved works already on site
- Missing owner documents
Questions
Questions owners ask
Who issues Trakhees CED structural calculations?
The Civil Engineering Department (CED) of Trakhees, which oversees JAFZA and Nakheel-developed communities including Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, and Jumeirah Islands.
Does Trakhees CED use different standards than DDA or DM?
Yes. Trakhees CED has its own drawing format and documentation requirements, distinct from DDA and Dubai Municipality standards.
What happens without Trakhees CED structural calculations?
Works carried out without the required approval are considered unauthorized and may be issued a stop-work order, with regularisation required before sign-off.
Can Structural Solutions handle the full process?
Yes. We prepare drawings and documentation, manage the CED portal submission, and carry the project through to issuance.