Slab Opening for Internal Staircase in Dubai

A duplex or internal stair needs an opening in the floor slab. We check the slab type, locate tendons in post-tensioned slabs, design trimming beams or strengthening, and stamp the calculations.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What We Check

Slab type, spans, tendons and the opening position.

How Apartment Merging Gets Approved

01

Your Plan and Unit Details

02

Structural Check of the Wall Between Units

03

Building management or developer NOC

04

Authority Permit (DM, DDA or Trakhees)

05

DCD Approval

06

Works, Completion and Title Deed Merge

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What You Get

A stamped opening design for the approvals.

What Apartment Owners Ask Us About

Slab Opening

Trimming Beams

Tendons

Scanning

Staircase

Duplex

Slab Opening for Internal Staircase in Dubai: The Short Answer

StepWhoWhat happens
1Structural SolutionsStructural check of the wall and slab between the units, then drawings and stamped calculations.
2Building management or developerNOC for merging the units.
3DM, DDA or Trakhees (by area)Permit for the structural and layout works.
4Dubai Civil Defence (DCD)Approval of fire compartment, sprinkler, alarm and exit changes.
5DLD (handled by us on your behalf)Title deed merge into one unit after completion.

What Gets Checked

  • Staircase opening: a stair between floors needs a slab opening and a structural design
  • Post-tensioned slabs: openings in post-tensioned slabs need the tendons located first; some zones cannot be cut
  • Structure checked: our engineers check walls, slabs and beams and stamp the calculations

What to Send Us

  • Title deeds of both units and owner ID
  • Floor plans of both units (from building management or the developer)
  • Photos of the wall, doors and services between the units
  • Your idea: a sketch of the merged layout
  • Drawings and calculations (we prepare these)
Steel beam supporting a new opening in a villa

Structure First

Wall and slab check

NOC and Permit

Building and authority

One Title Deed

DLD merge handled

Why Owners Merge Apartments With Us

Structure First

We check the wall and slab between the units before anything else, so you know early if merging is possible.

Every Approval in One Scope

Building management NOC, authority permit and DCD approval handled in the right order.

Title Deed Merge Too

We handle the DLD title deed merge on your behalf once the works are approved.

Thinking of Merging Two Apartments?

Send us the unit numbers, floor plans and photos. We will check if merging is possible and handle the approvals and the title deed merge.

Slab Opening for Internal Staircase in Dubai FAQs

Can I cut the slab for a staircase?

Sometimes, after a structural check.

Is merging two apartments possible in every tower?

Not always. If the wall between the units is a shear wall or part of the core, openings may be limited or not allowed. A structural check answers this first.

Who approves apartment merging?

The building management or developer NOC comes first, then the area authority permit and DCD approval for fire safety.

Will I get one title deed?

Yes, the units can be merged into one title deed with DLD after the works are approved. We can handle it on your behalf.

Do sprinklers and alarms need changes?

Usually yes. The new layout changes fire compartments and coverage, which DCD approves.