We coordinate the calculations with the sign drawings and the rest of the submission.
RTA Billboard Structural Calculations
Signage submissions to RTA for larger, rooftop, freestanding or heavy signs typically need engineer-stamped structural calculations. We prepare them in the form RTA reviewers expect.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What We Check
Wind load, the sign’s self-weight, the frame members, connections and anchors, and the structure the sign is fixed to — wall, cladding, parapet, roof slab or foundation.
Our Calculation Process
01
Sign Drawings & Site Information Reviewed
02
Supporting Structure Checked
03
Loads Calculated (Wind & Self-Weight)
04
Frame, Connections & Anchors Designed
05
Calculations Stamped by Engineer
06
Submitted With the Sign Approval
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
What You Receive
Projects We Handle
Rooftop Sign
Pylon
Billboard
Facade Sign
LED Screen
Projecting Sign
RTA Billboard Structural Calculations at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the road frontage and prepares drawings in DLTM coordinates for RTA. |
| 2 | Master developer (where applicable) | NOC for works in the community. |
| 3 | RTA | Reviews the drawings and issues the NOC or permit. |
| 4 | Service authorities | DEWA and telecom clearances where services are affected. |
| 5 | RTA | Inspection and reinstatement check after works. |
Documents Required
- Affection plan / site plan
- Owner or company documents
- Survey-based drawings in DLTM coordinates
- Developer NOC (in master-developer communities)
- Existing services information, where available
Key Technical Rules
- Approval before road works: any work in the road reserve needs RTA approval first.
- DLTM drawings: RTA reviews drawings in DLTM coordinates.
- Utility clearances: DEWA and telecom services are checked where they run under the works.
- Work zone safety: works follow RTA work zone traffic management rules.
- Reinstatement: the road, kerb and footpath are reinstated and inspected.
RTA Approval
Before road works
DLTM Drawings
Survey-based
Utility Clearances
Where needed
Why Businesses and Sign Companies Choose Structural Solutions
Structural Engineering In-House
Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.
Engineer-Stamped Drawings
Drawings and calculations stamped for landlords, malls, developers and authorities.
Full Approval Route
From the landlord, mall or developer NOC through to the authority signage permit.
Get Your Signage Approved
Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.
RTA Billboard Structural Calculations — FAQs
Who stamps signage structural calculations?
A registered engineering consultant.
Do you work with sign companies?
Yes — we prepare calculations and drawings for sign makers and fit-out companies.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Can you work with my sign company?
Yes — we provide structural calculations, stamped drawings and approval support for sign makers.