Can I keep the foundations and rebuild on them?

To rebuild on existing foundations or a basement, a structural assessment must first confirm they can safely carry the new villa. The authority decides on the submitted assessment.

Keeping the foundations depends on their condition, the new loads and the new layout. Our engineers assess the existing structure, review any drawings, and prepare the report and calculations for the approval.

PossibleAfter structural assessment
Depends onCondition and new loads
ReportBy our engineers
DecisionBy the authority

Rebuild on existing foundations: what you need to know

  • Condition survey: Existing foundations and basement
  • New loads: The new villa design
  • Drawings: Existing records if available
  • Approval: Assessment submitted with the design

What to send us

  • Title deed and owner Emirates ID or passport
  • Affection plan or plot number
  • Existing drawings, if available (we can obtain or survey)
  • Photos of the villa
  • New design status (ready or not yet)

Your two options

Demolish first, or design first

In master communities the developer NOC comes first. We confirm the route for your plot.

OptionApproval routeGuides
Option A: design first
Preliminary design approval → mobilization permit
Demolition is done at the mobilization permit stage, then construction continues as one project.Option A
Option B: demolish first
Demolition permit → demolition completion
Demolish and close the demolition file first; the new design approval follows when you are ready.Option B
Completion
Emirates Hills
Emaar NOC → Dubai Municipality
Both options available; we confirm the sequence for your plot.Emirates Hills
Dubai Hills third-party plots
Emaar NOC → DDA
Both options available.Dubai Hills plots

How it works

How it works

1. Plot check

Authority, developer NOC and plot rules for your villa.

2. Choose the option

Demolish first, or design first and demolish at mobilization.

3. NOC and permit

We apply for the developer NOC and the demolition permit.

4. Demolition

Carried out by a licensed demolition contractor.

5. Inspection and completion

Close the demolition, or continue to construction.

Planning to demolish?

Get the right route for your plot today

Send us three things on WhatsApp:

  1. Your plot number or affection plan
  2. A photo of the title deed
  3. Whether your new design is ready

We reply with the option that fits your plot and handle the developer NOC, the demolition permit and the completion.

Questions

More questions about rebuild on existing foundations

Can I reuse my old foundations?

Only if a structural assessment confirms they can carry the new villa.

Who decides?

The authority, based on the submitted assessment.

Do you do the assessment?

Yes, our engineers prepare it.

What if they are not suitable?

Full demolition and new foundations.