Nakheel Plot Access & Tie-In Drawings

We prepare permanent plot access and tie-in drawings for villas in Nakheel communities — showing how the new driveway connects to the existing carriageway, in PDF and AutoCAD DLTM format for Nakheel and RTA.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What the Drawings Show

The plot limit, the access position and width, the kerb cut, interlock, levels and falls, and the tie-in to the existing carriageway and footpath — all set out in DLTM coordinates from a site survey.

How We Get Your Plot Access Approved

01

Site Survey & Plot Limits (DLTM)

02

RTA Access Design Study

03

Developer Plot Access NOC

04

RTA Construction NOC

05

RTA Sidewalk Modification Permit

06

Works, Handover & Deposit Refund

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

One Design for Every Approval

The same access design runs through the RTA design study, the Nakheel NOC, the RTA construction NOC and the sidewalk permit. Keeping one coordinated drawing set avoids returned submissions.

Projects We Handle

Permanent Plot Access

Driveway Tie-In

Kerb & Footpath Tie-In

Levels & Falls

Second Access

Access Relocation

Nakheel Plot Access & Tie-In Drawings at a Glance

StepWhoWhat happens
1Structural engineerSurveys the plot and prepares access, kerb and interlock drawings in PDF and AutoCAD DLTM.
2RTAAccess design study (concept approval).
3NakheelPlot access, curb cut and interlock NOC where the community has one.
4RTAConstruction NOC, then the sidewalk modification permit.
5RTA and developerInspection after works and security deposit refund.

Documents Required

  • Title deed and affection plan
  • Owner passport and Emirates ID copy
  • Survey-based drawings in PDF and AutoCAD DLTM
  • RTA-approved access design (for the developer NOC)

Key Technical Rules

  • Order of approvals: RTA access design study → developer plot access NOC → RTA construction NOC → sidewalk modification permit.
  • DLTM drawings: developers such as Nakheel return drawings that are not PDF plus AutoCAD DLTM.
  • Outside the plot limit: kerb, verge and interlock works are in the road reserve.
  • No early works: concept approval alone does not allow works on site.
  • Deposit refund: after the works are inspected and accepted.
RTA parking and access approval in Dubai — Structural Solutions

RTA Design Study

First step

DLTM Drawings

PDF + AutoCAD

Sidewalk Permit

Before works

Why Owners Choose Structural Solutions

Full Access Approval Chain

RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.

DLTM Drawings From Site Survey

We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.

Fewer Returned Submissions

Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.

Get Your Plot Access Approved

Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.

Nakheel Plot Access & Tie-In Drawings — FAQs

What is a tie-in drawing?

A drawing showing how the new access connects to the existing carriageway — position, levels, kerb and paving.

Which format do you supply?

PDF plus AutoCAD in DLTM coordinates.

Do you prepare the access drawings?

Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.

Can works start before all approvals?

No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.

Who handles the submissions?

We prepare the drawings and handle the RTA and developer submissions as your consultant.