Quick answer
Apartment modifications in Nakheel buildings need an NOC from the building management before work starts. Works that change the structure, such as removing walls or making new openings, also need a Trakhees permit with drawings and stamped structural calculations. Like-for-like finishes are treated differently from works that change walls, services or the structure, so check the scope first.
Last checked: November 2026. Official sources: Nakheel · Trakhees
Apartments in Nakheel towers on Palm Jumeirah and in other Nakheel communities share a structure and building services with their neighbours. That is why changes inside an apartment are controlled, even when they feel private.
Works that need approval
- Removing or moving internal walls
- New openings in walls or slabs
- Kitchen or bathroom relocation
- Changes to plumbing, drainage, air conditioning or electrical layouts
- Enclosing balconies and changes to façades or windows
- Raised floors, heavy finishes or heavy equipment
Who approves what
- Building management NOC. The first approval comes from the building management, for Nakheel buildings Nakheel or the building’s management company. We confirm who it is for your building.
- Trakhees permit for structural works, with drawings and stamped structural calculations.
- Fire and life safety approval where the works affect fire safety items.
Load-bearing or not?
Many apartment walls look the same, but some carry load. Before any wall is removed, an engineer checks the drawings and the structure. If the wall is structural, the design and calculations go with the permit application. See structural calculations in Dubai.
Drawings
The building management or Nakheel can usually provide the apartment drawings. Where they are missing or the apartment has changed, we survey it and prepare as-built drawings.
Questions owners ask
Do I need approval to renovate my apartment in a Nakheel building?
For works that change walls, services or the structure, yes: a building management NOC, and a Trakhees permit for structural works.
Can I remove a wall in my apartment?
Only after an engineer confirms whether it is load-bearing. Structural walls need a design, stamped calculations and a Trakhees permit.
Can a tenant apply?
A tenant needs the landlord’s written consent before applying for the NOC.
What if previous works were done without approval?
They can be reviewed and approved later where they meet the requirements, or changed. We assess the apartment and prepare the drawings.
Related service
Apartment modification approvals
We check the structure, prepare the drawings and calculations, and handle the building NOC and Trakhees permit.
Nakheel approvals →Trakhees approvals →