Finish the build as approved, prepare as-built drawings and the owner letter, pass the DCM and DDA inspections, and receive the completion certificate.

Jebel Ali Hills construction sign-off means the final inspection and the completion certificate for your approved villa build. DCM, the master developer, inspects the works against the approved NOC drawings, and the Dubai Development Authority (DDA) carries out its final inspection and issues the completion certificate. The order of the two inspections can vary.

Final inspectionDeveloper and authority
Owner letterCompletion pack
Completion certificatePermit closed

Works finished?

Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.

Request sign-off online →

What the inspectors check

  • Built as approved: DCM and DDA check the finished works against the approved drawings. Any change must be approved or corrected before sign-off.
  • As-built drawings: Drawings of the works as built, matching the approved drawings, are needed for the final inspection and the completion certificate.
  • Owner letter: A signed owner letter is required for the completion certificate.
  • Deposit: Where the developer took a refundable deposit, it is returned after clearance.

Documents you will need

  • Approved NOC and permit drawings
  • Photos of the finished works
  • Title deed and owner ID
  • Contractor details, if available
  • Any inspection comments received

How it works

How Jebel Ali Hills construction sign-off works

01

Works finished as approved

02

As-built drawings and owner letter

03

DCM final inspection

04

DDA final inspection

05

Completion certificate

06

Deposit returned after clearance

Who does what

Who is involved in Jebel Ali Hills sign-off

📐

Structural Solutions

As-built drawings, structural check and the owner letter pack. We request and attend the inspections.

🏘️

DCM

Final inspection against the approved NOC drawings, for works in Jebel Ali Hills. Returns any refundable deposit after clearance.

🏛️

DDA

Final inspection of the permitted works, then the completion certificate that closes the permit.

What holds up sign-off

  • Works differ from the approved drawings
  • No as-built drawings
  • Owner letter missing
  • Inspection comments still open

Questions

Frequently asked questions

Who inspects my Jebel Ali Hills villa for sign-off?

DCM and DDA. The order can vary.

Which authority issues the completion certificate in Jebel Ali Hills?

DDA issues it after its final inspection.

Do I need as-built drawings for sign-off?

Yes. As-built drawings of the finished works and a signed owner letter are needed for the completion certificate.

What happens if I skip the Jebel Ali Hills sign-off?

The permit stays open, which can delay a sale. Buyers and banks may ask for it to be closed.

Can you help with an older Jebel Ali Hills permit?

Yes. Send us the NOC and permit details and we will review what is needed to close it.

Who is the master developer for Jebel Ali Hills?

DCM is the master developer and DDA is the building authority. The DCM NOC comes before the DDA building permit.

Can I use my own contractor for my Jebel Ali Hills build?

Yes. We handle the consultant, drawings and DDA permit side and coordinate with your contractor.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works. We confirm the approvals needed and prepare the submission.