Survey, drawings, approvals and the title deed merge.
I Merged My Apartments Without Approval: What Now?
Get a structural assessment first, to confirm the opening is safe. Then we survey the unit, prepare as-built drawings and apply for approval of the existing works. Parts that cannot be approved may need changing.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
First Priority
Structural safety of the opening.
How Apartment Merging Gets Approved
01
Your Plan and Unit Details
02
Structural Check of the Wall Between Units
03
Building management or developer NOC
04
Authority Permit (DM, DDA or Trakhees)
05
DCD Approval
06
Works, Completion and Title Deed Merge
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Then
What Apartment Owners Ask Us About
Opening
Wall Removed
Staircase
Fire Safety
Services
Title Deed
I Merged My Apartments Without Approval: What Now: The Short Answer
| Step | Who | What happens |
|---|---|---|
| 1 | Structural Solutions | Structural check of the wall and slab between the units, then drawings and stamped calculations. |
| 2 | Building management or developer | NOC for merging the units. |
| 3 | DM, DDA or Trakhees (by area) | Permit for the structural and layout works. |
| 4 | Dubai Civil Defence (DCD) | Approval of fire compartment, sprinkler, alarm and exit changes. |
| 5 | DLD (handled by us on your behalf) | Title deed merge into one unit after completion. |
What Gets Checked
- Regularising: merges done without approval can often be surveyed and approved; some may need changing
- Wall between units: if it is a shear wall or part of the core, openings may be limited or not allowed
- Fire safety: merging changes fire compartments, sprinklers, alarms and exits, which DCD approves
What to Send Us
- Title deeds of both units and owner ID
- Floor plans of both units (from building management or the developer)
- Photos of the wall, doors and services between the units
- Your idea: a sketch of the merged layout
- Drawings and calculations (we prepare these)
Structure First
Wall and slab check
NOC and Permit
Building and authority
One Title Deed
DLD merge handled
Why Owners Merge Apartments With Us
Structure First
We check the wall and slab between the units before anything else, so you know early if merging is possible.
Every Approval in One Scope
Building management NOC, authority permit and DCD approval handled in the right order.
Title Deed Merge Too
We handle the DLD title deed merge on your behalf once the works are approved.
Thinking of Merging Two Apartments?
Send us the unit numbers, floor plans and photos. We will check if merging is possible and handle the approvals and the title deed merge.
I Merged My Apartments Without Approval: What Now? FAQs
What do I do after an unapproved merge?
Structural check, then regularise.
Is merging two apartments possible in every tower?
Not always. If the wall between the units is a shear wall or part of the core, openings may be limited or not allowed. A structural check answers this first.
Who approves apartment merging?
The building management or developer NOC comes first, then the area authority permit and DCD approval for fire safety.
Will I get one title deed?
Yes, the units can be merged into one title deed with DLD after the works are approved. We can handle it on your behalf.
Do sprinklers and alarms need changes?
Usually yes. The new layout changes fire compartments and coverage, which DCD approves.
