Floor load · For suppliers

Floor Load Assessment for Safe Suppliers in Dubai

Safe and vault suppliers face the same question on every heavy delivery: can the floor and the lift take it? Here is how we work with suppliers on every job.

Floor load assessment for safe suppliers

Send us the safe datasheet, the customer’s location and the floor plan, and we run the structural analysis from the as-built drawings. Where needed, we design the steel base or spreader plate and anchoring, and we check the delivery route and the lift. Your customer, building management, the project’s consultant or the authorities receive a full report, and your delivery goes ahead with the floor confirmed.

ForSafe and vault suppliers
CoversFloor, base, route and lift
You receiveA full report per job

What we handle for suppliers

  • Floor check: At the customer’s location
  • Base design: Spreader plate and anchoring
  • Route and lift: Delivery path
  • Report: For building management review
  • Repeat jobs: The same process every time

Documents you will need

  • Safe datasheet
  • Customer’s floor plan and location
  • As-built drawings, if available

How it works

How we work with suppliers

1. Item details

Weight, footprint and datasheet.

2. As-built drawings

We obtain or review them.

3. Analysis

Slab capacity against the added load.

4. Load spreading

Steel base or spreader plate and anchoring, if needed.

5. Route and lift

Delivery path and lift capacity.

6. Full report

Detailed analysis for review.

Related guides

  • Safe installation floor load
  • Delivery route and lift check
  • Strong room assessment
  • Engineer report for a safe

What delays deliveries

  • Floor check started too late
  • Lift not confirmed
  • Building management asks for more detail

Need a floor load check?

Check the floor before delivery

Send us three things on WhatsApp:

  1. The item, its weight and footprint (datasheet)
  2. The area, the floor and where the item will sit
  3. As-built drawings, if you have them

We run the analysis from the as-built drawings, design the spreader plate and anchoring if needed, check the route and the lift, and send you the full report.

Questions

Supplier questions

Do you work with safe suppliers on repeat jobs?

Yes, with the same process for every delivery.

What do you need for each job?

The safe datasheet, the customer’s floor plan and location, and the as-built drawings if available.

Who receives the report?

Your customer, and building management, the project’s consultant or the authorities as needed.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.