Fit-Out Done Without Approval in Dubai: What to Do

Your office, shop or restaurant was fitted out without the landlord NOC, the fit-out permit or the Civil Defence approval. Built fit-outs take an as-built route, not the new works route. We survey the unit and help you from there.

A fit-out that is already built does not go through the new fit-out route. It takes an as-built route, and a fine may apply, depending on the case. Fire safety matters most here, so we survey the unit, prepare the as-built drawings including the fire safety layout, and advise you on the route for your case.

RouteAs-built, not new works
Key checkFire safety
FineMay apply, depends on the case

What we check

What we look at in a built fit-out

ItemWhy it matters
Partitions and ceilingsLayout and fire rating
Exits and escape routesCivil Defence requirements
Fire alarm and sprinklersChanged by the new layout or not
Kitchen, if anyFood layout and extraction
Mezzanine or heavy equipmentStructure and floor loads

Related

Related guides

TopicGuide
Fit-out NOC (new works)Fit-out NOC in Dubai
As-built drawingsAs-built drawings
Unauthorised worksUnauthorised works

Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence

What you need to know

  • Built fit-outs take the as-built route.
  • Fire safety is the first check.
  • A fine may apply, depending on the case.
  • The landlord or building management is involved.

Documents you will need

  • Lease or title deed
  • Trade licence
  • Photos of the unit
  • Any notice from the landlord or authority

How it works

How we help with a built fit-out

1. Tell us

Unit and building.

2. Site visit

We see what was built.

3. Survey

Measured on site.

4. Drawings

As-built drawings.

5. Structure

Report if needed.

6. Advice

The route for your case.

Already done

What to do now

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Built fit-out questions

Does it follow the normal NOC route?

No. Built works take an as-built route, not the new works route. Contact us and we will help you accordingly.

Will I get a fine?

The developer or the authority may apply a fine, depending on the case. We cannot say more until we review your case.

Does a built fit-out need Civil Defence?

Fire safety is checked in every fit-out. We include the fire safety layout in the as-built drawings.

Can I keep trading while this is sorted?

It depends on the case. Contact us and we will advise you.

Who can help?

Structural Solutions reviews what was built, surveys the site, prepares the as-built drawings and the structural report, and advises you on the route for your case. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.