Closed a Balcony in Dubai Hills Without a NOC? What to Do
Closing a balcony in Dubai Hills without a NOC can lead to stopped works and problems at resale. It is usually better to survey it and apply for approval early.
The short answer
A balcony closed without an Emaar NOC is unapproved work, even if a glazing company installed it properly. Emaar can stop the works and ask you to correct them, and it can also hold up a later NOC or a sale. If the closure is at the rear and can meet the rules, we survey it, prepare as-built drawings and calculations, and apply for approval. If it is a front balcony, contact us to help you accordingly.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Glazing contractors: A work order is not an approval.
- Bought it that way: Earlier owners’ works still need to be checked.
- New works: Older changes are dealt with before a new NOC.
- Selling: Unapproved works can come up during a sale.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask
Can a closed balcony be approved after the works?
A rear closure may be, subject to Emaar’s review. We survey it first.
What if it is a front balcony?
Emaar reviews front balconies case by case. Contact us to help you accordingly.
Will this affect a new NOC?
Yes, earlier works are checked before new works.
Who can help?
We survey it, prepare the drawings and handle the application.