Why were my structural calculations rejected?

Usually because they do not match the drawings or the site, a load or element was not checked, the design basis or code was unclear, or the stamp or format did not meet the authority's requirements. The comments are answered and the report is resubmitted.

The short answer

Reviewers at the developer, DM, DDA, Trakhees or DMCC check that the calculations cover every structural element and load, follow the accepted codes and match the drawings. Missing wind or equipment loads, foundations not checked, connections left out or a different structure on site are common reasons for comments.

Common causesMismatch with drawings, missing checks
FormatStamp and layout the authority expects
FixAnswer comments and resubmit

What you need to know

  • Mismatch: The calculations and drawings show different sizes or layouts.
  • Missing loads: Wind, equipment or new floor loads not included.
  • Missing elements: Foundations or connections not checked.
  • Site differs: The existing structure is different from the drawings.

Documents you will need

  • The rejection comments
  • Submitted calculations and drawings
  • Photos of the site

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Read the comments
Structural Solutions
Understand what the reviewer needs.—
Survey if needed
Structural Solutions
Check the site against the drawings.—
Revise
Structural Solutions
Updated calculations and drawings.Structural calculations in Dubai
Resubmit
Consultant
Back to the reviewer.—

Questions

Related questions

Can you fix calculations prepared by someone else?

Yes, we can review and revise them.

Do different authorities want different formats?

Yes; we prepare to the format each one expects.

Will I need a site survey?

If the site differs from the drawings, yes.

How many resubmissions are allowed?

It depends on the authority; clear answers to every comment avoid repeats.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.

Related guides

Keep reading