Foundations · Soil Tests

Do I need a soil test for a villa extension?

If the extension has new foundations, yes. A soil test is required wherever a substructure is built.

The short answer

Yes, if the extension needs new foundations. A soil test is required wherever a substructure is built, such as the foundations of an extension, a garden suite, a pool, a pergola, a car shade or a boundary wall. The results are used to design the foundations, and the structural calculations are stamped for the developer NOC and the building permit.

NeededWherever a substructure is built
Used forFoundation design
ThenCalculations and approvals

What you need to know

  • Substructures: Foundations for extensions, pools, shades and walls.
  • Foundation design: Based on the soil test.
  • Calculations: Stamped for approval.
  • Shoring: Where the excavation needs it.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Soil test
Soil testing laboratory
Required wherever a substructure such as a foundation is built.Soil tests
Foundation design
Structural Solutions
Foundation and substructure calculations and drawings.Structural calculations
Shoring, where needed
Consultant → DM, DDA or Trakhees
Shoring design and approval where the excavation needs it.Shoring
NOC and permit
Developer and authority
The developer NOC first, then the building permit.Approvals
Inspection
Authority
Inspections and the completion certificate.—

Questions

Related questions

Do I need a soil test for a pergola?

If it has new foundations, yes.

Who carries out the soil test?

A soil testing laboratory.

Can I use an old soil test?

Ask us; we check whether it can be used for your plot.

What if I extend upwards only?

The existing foundations are checked by assessment.

Related guides

Keep reading