Do I Need a Dubai Municipality Permit to Merge Apartments?

Merging two apartments in Downtown Dubai or Burj Khalifa needs a Dubai Municipality permit, after the Emaar building management NOC, plus Civil Defence (DCD) approval. In other areas the permit comes from DDA, Trakhees or DMCC instead. Here is who approves what, by area, and how we handle it.

Dubai Municipality permit to merge apartments

In Downtown Dubai and Burj Khalifa, yes. The Emaar building management NOC comes first, then Dubai Municipality approves the structural and layout works and DCD approves the fire safety changes. After completion, the units can be merged into one title deed with DLD, which we handle on your behalf. In Business Bay, Emaar Beachfront, Dubai Creek Harbour and DIFC the permit comes from DDA, on Palm Jumeirah from Trakhees, and in JLT from DMCC through Concordia. Before any approval, we check the wall and slab between the units, because a shear wall or core wall can limit the opening.

Downtown and Burj KhalifaDubai Municipality permit
Also neededBuilding management NOC and DCD
After completionOne title deed with DLD

Why merging apartments needs a permit

  • Wall opening: Between the two units
  • Structure: Wall and slab checked first
  • Services: AC, water and electrical combined
  • Fire safety: Compartments, sprinklers, alarms and exits
  • Layout: Kitchens, bathrooms and entrances
  • Title deed: Merged with DLD after completion

Documents you will need

  • Title deeds of both units and owner ID
  • Floor plans of both units, from building management or the developer
  • Photos of the wall, doors and services between the units
  • A sketch of the merged layout you want
  • Drawings and calculations, which we prepare

By area

Who approves apartment merging, by area

Dubai Municipality issues the permit in Downtown and Burj Khalifa. Other areas have their own authority.

AreaApproval routeGuides
Burj Khalifa and Downtown Dubai
Dubai Municipality
Emaar building management NOC, then Dubai Municipality and DCD, then the DLD title deed merge.Burj Khalifa
Downtown Dubai
Business Bay
DDA
Building management NOC, then DDA and DCD.Business Bay
Emaar Beachfront and Dubai Creek Harbour
DDA
Emaar building management NOC, then DDA and DCD.Emaar Beachfront
Dubai Creek Harbour
Dubai Marina and JBR
Area authority
Dubai Holding NOC, then the authority for the area and DCD.Dubai Marina
DIFC
DDA
DIFC NOC, then DDA and DCD.DIFC
Palm Jumeirah
Trakhees
Nakheel NOC, then Trakhees and DCD.Palm Jumeirah
JLT
DMCC
Building management NOC, then DMCC through Concordia, DCD and the Concordia COC.JLT

How it works

How apartment merging gets approved in Downtown

1. Your plan

Unit details and the layout you want.

2. Structural check

The wall and slab between the units.

3. Building management NOC

From Emaar building management.

4. Dubai Municipality permit

For the structural and layout works.

5. DCD approval

Fire compartments, sprinklers, alarms and exits.

6. Completion and title deed

Works, completion and the DLD merge.

What stops a merging permit

  • The wall between the units is a shear wall or part of the core
  • No building management NOC
  • Fire safety changes not shown for DCD
  • Works started before the permit
  • Drawings that do not match the units

Thinking of merging two apartments?

Check if your units can be merged

Send us three things on WhatsApp:

  1. The building and both unit numbers
  2. Floor plans of both units
  3. Photos of the wall between them

We check the wall and slab, then handle the building management NOC, the authority permit, DCD and the title deed merge.

Questions

Dubai Municipality permit to merge apartments: questions

Is a DM permit needed to merge apartments?

In Downtown Dubai and Burj Khalifa, yes, after the Emaar building management NOC and with DCD approval. In other areas the permit comes from the authority for that area, such as DDA, Trakhees or DMCC.

Is merging two apartments possible in every tower?

Not always. If the wall between the units is a shear wall or part of the core, openings may be limited or not allowed. A structural check answers this first.

Who approves apartment merging?

The building management or developer NOC comes first, then the area authority permit and DCD approval for fire safety.

Will I get one title deed?

Yes, the units can be merged into one title deed with DLD after the works are approved. We can handle it on your behalf.

Do sprinklers and alarms need changes?

Usually yes. The new layout changes fire compartments and coverage, which DCD approves.

Who submits the application to Dubai Municipality?

We prepare the drawings and calculations and submit them as your consultant.

What if the apartments are already merged without a permit?

The authority may apply a fine, depending on the case. Contact us and we help you accordingly through the as-built route.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading