DAMAC Villa Modifications: DAMAC NOC, Then the DDA Permit

✍️ Written by our engineers🏛️ Dubai approvals guide✅ Independent consultant
Dubai skyline with Burj Khalifa and a villa community at golden hour

DAMAC villa modifications in DAMAC Hills and DAMAC Hills 2 follow two steps: a DAMAC NOC, and then a DDA building permit. Works start only after the permit is issued. They are not handled by Dubai Municipality.

Last checked: November 2026. Official sources: DAMAC · DDA

Unlike communities that use a portal or an app, the DAMAC NOC is applied for. This guide explains the route for villa owners in DAMAC Hills and DAMAC Hills 2.

Who approves villa works

The steps

  1. Plans. Use the plans from your handover documents. If you do not have them, the villa is surveyed and drawn as built.
  2. Drawings and calculations. Structural works need stamped structural calculations.
  3. DAMAC NOC, applied for.
  4. DDA building permit.
  5. Works on site, built to the approved drawings.
  6. Sign-off: final inspection and completion certificate. See DAMAC Hills completion certificate and DAMAC Hills 2 sign-off.

Common works

A swimming pool also needs the environmental NOC from the Dubai Municipality Environment Department. See pool environmental NOC in DAMAC Hills.

DAMAC Hills or DAMAC Hills 2?

The route is the same: DAMAC NOC, then DDA. Start with the page for your community: DAMAC Hills or DAMAC Hills 2.

Buying or selling

If you are buying, check what the previous owner got approved: is the previous owner’s extension approved? If you are selling with unapproved works, see selling a DAMAC Hills villa with unapproved changes.

Questions owners ask

How do I apply for a DAMAC NOC?

To DAMAC, with the drawings for your works. We prepare the file and handle the application.

Is DAMAC Hills under DM or DDA?

DDA. DAMAC Hills and DAMAC Hills 2 both go through DAMAC and then DDA.

Can I start work once I have the DAMAC NOC?

No. Works start only after the DDA building permit is issued.

Does DAMAC give me my villa plans?

Use the plans from your handover documents. If you do not have them, we survey the villa and draw it as built.

Do I get the developer deposit back?

Where a security deposit is paid, it is returned after clearance.

Related service

DAMAC approvals

We prepare the drawings and calculations and take your villa works through DAMAC and DDA.

DAMAC approvals →DAMAC villa extension →

Ask about my DAMAC villa

Need this approved?

Send us photos and the location. We will tell you which approvals apply and handle them for you.

Get a QuoteCall +971 55 339 4451